My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-40 AUTHORIZING AGREEMENT WITH GMRI, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-40 AUTHORIZING AGREEMENT WITH GMRI, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 11:17:14 AM
Creation date
12/2/2015 11:16:54 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-40
Res Ord Title
AUTHORIZING AGREEMENT WITH GMRI, INC. FOR OLIVE GARDEN PROPERTY
Approved Date
3/20/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Decatur—06G0023 c8 - final <br /> � 10/19/O5, 10/20/05,10/21/O5, 10/24/O5, 11l11/O5, 12/20/O5, I/31/06 <br /> EXHIBIT"D" <br /> GRADING AND COMPACTION STANDARDS <br /> Foundation and Subgrade Soil Preparations <br /> Seller will dispose of all topsoil, vegetation and/or other unsuitable soils, debris or any deleterious materials, <br /> including but not limited to, environmentally contaminated soils in accordance with federal state and local <br /> requirements. Upon completion of disposal, the exposed subgrade soils within the proposed building and <br /> pavement areas as reflected by Buyer's plans shall be proof-compacted with suitable heavy construction <br /> equipment, under the observations of the Seller's geotechnical consultant. The exposed subgrade soils shall be <br /> compacted to a firm and unyielding condition and a minimum density of 95% of the soils standard Proctor <br /> (ASTM D-698) value as tested for a minimum of 12 inches below the compacted surface. Each 12 inch thick lift <br /> of fill shall be compacted to a firni and unyielding condition and a minimum density of 95% of the soils standard <br /> Proctor value. The fill shall be free of organics,have a PI of 20 or less, have a maximum particle size of 2 inches <br /> and shall be placed and compacted at a moisture content equal to or less than the optimum moisture content <br /> determined by the standard Proctor test. The placement and compaction of each lift of fill shall be inspected, <br /> � <br /> tested and a roved b the Seller s eotechnical consultant before subse uent lifts can be laced and com acted. <br /> PP Y g q P P <br /> Upon completion of filling the building and pavement areas to the elevations stated below, the certification ]etter <br /> to be delivered by Seller's geotechnical consultant shall state that the building pad and pavement areas have been <br /> satisfactorily cleared of unsuitable debris,the natural in-place soils properly compacted, as required herein,the fill <br /> meets the requirements described herein and has been properly placed and compacted as required. Further, the <br /> certification letter shall state the prepared building area is suitable to support the planned single-story restaurant <br /> on conventional shallow foundations with a maximum soil bearing pressure of 3,000 psf and a concrete slab on <br /> grade; and the pavement area subgrade soils are suitable to support an asphaltic or concrete pavement. <br /> Seller further agrees to construct the building pad and pavement subgrade to elevations shown on the <br /> Development Plans (identified in Rider Part B) as previously reviewed and approved by Buyer. Within 10 days <br /> after completion of the building pad and pavement subgrade by Seller, Seller shall deliver to Buyer an as-built <br /> survey, signed and sealed by a licensed surveyor or engineer certified to Buyer, delineating the final grades of the <br /> Property's building pad and pavement subgrade areas including a notation from the engineer or surveyor that the <br /> Property grades are in conformance with the Development Plans. <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.