My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-157 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-157 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 3:45:27 PM
Creation date
12/7/2015 3:45:27 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-157
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT SANITARY SEWER HERBICIDE ROOT CONTROL
Approved Date
11/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> COUNCIL COMMUNICATION FORM <br /> Engineering& Infrastructure Memorandum <br /> NO. 2005-69 <br /> November 1, 2005 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garma ity Manager <br /> Stephen Swa , P.E.,Director of Engineerin & Infrastructure� <br /> Matthew C. Newell, P.E., City Engineer�,��� <br /> Douglas R. Nooden,Assistant City Engineer <br /> SUBJECT: Sanitary Sewer Herbicide Root Control, City Project OS-20 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Sanitary Sewer Herbicide Root Control, City Project OS-20, to Tele Scan, Inc., as <br /> the lowest, responsible bidder in the amount of$63,070.35, and that the Mayor be authorized <br /> to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> Sanitary sewer lines are extremely susceptible to root intrusion due to the type of loose jointed <br /> pipes historically used for construction of sanitary sewers, and the proximity of trees that have <br /> been planted in or near the right of way. <br /> Root growth easily extends through backfill materials to find an attractive source of year <br /> round moisture within the trench line. Roots ultimately penetrate the joints and cracks of <br /> sewers in search of water and grow to fill the main, trapping solids and impeding flow, <br /> thereby creating a significant source of sewer backups. <br /> The project consists of the application of a root herbicide to retard and eliminate any root <br /> growth present in the target lines. The herbicide chemical is combined with a foaming agent <br /> that is applied by means of jetting equipment to the inside of the sewer pipe. Foam fills the <br /> pipe and causes the herbicide to cover and stick to any tree roots that it comes in contact with. <br /> The herbicide proceeds to kill the roots that are in the pipe and within a short distance of the <br /> outer wall while leaving the main tree structure undamaged. <br /> Project locations have been determined through the evaluation of televised sewer inspection <br /> reports and videos. The herbicide root control program is intended to supplement root cutting <br /> work performed by City maintenance crews. <br /> The project plans and specifications were prepared by Engineering Division staff. The project <br /> was advertised October 18, 2005, and bids were opened on October 31, 2005. The results for <br /> the letting are as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.