My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-156 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-156 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 3:46:57 PM
Creation date
12/7/2015 3:46:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-156
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT SOUTH 51 WATER MAIN REHABILITATION
Approved Date
11/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2005-67 <br /> October 31, 2005 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm City Manager � <br /> Stephen Sw nson, P.E.,Director of Engineering & Infrastructure <br /> Mathew C. Newell, P.E., City Engineer�GG( ' <br /> Douglas R. Nood'en, P.E.,Assistant City Engineer ' <br /> SUBJECT: South 51 Water Main Rehabilitation, City Project 05-14 , <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the , <br /> contract for the South 51 Water Main Rehabilitation, City Project OS-14, to Entler Excavating � <br /> Company, Inc., as the lowest, responsible bidder in the amount of $40,175.00, and that the <br /> Mayor be authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> Over the past two years, the major water main serving the South Shores area has experienced at <br /> least two significant breaks. One of the more recent breaks earlier this past summer forced the <br /> main to be shut off until repairs are completed. As part of the repair investigation, the City <br /> inserted a camera into the water main to inspect the line and determine the exact extent of <br /> damage and also document all of the main's valves and fittings. <br /> This project will remove and replace a broken section of pipe and also remove and replace a <br /> valve in the 12 inch water main feeding into South Shores. <br /> The project plans and specifications were prepared by Engineering Division staff. The project <br /> was advertised October 14, 2005, and bids were opened on October 28, 2005. The results for the <br /> letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $ 47,075.00 ---- <br />' Entler Excavating Co., Inc. $ 40,175.00 (-14.66 %) <br />� Burdick Plb. & Htg. Co., Inc. $ 43,075.00 (- 7.96 %) <br /> Entler Excavating Co., Inc. provided the low bid for the proposed work. Staff recommends that <br /> the City Council approve a contract with Entler Excavating Co., Inc. to perform the South 51 <br /> Water Main Rehabilitation Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.