My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-135 AUTHORIZING CHANGE ORDER
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-135 AUTHORIZING CHANGE ORDER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 9:50:37 AM
Creation date
12/8/2015 9:50:37 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-135
Res Ord Title
AUTHORIZING CHANGE ORDER FIRE STATION DRIVEWAY REHABILITATION
Approved Date
10/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2005-63 <br /> Se tember 27, 2005 <br /> P <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garman., City Manager 6L� <br /> Stephen Swanson, P. E., Director of Engineering & Infrastructure <br /> Matthew C. Newell, P. E., City Engineer��f� <br /> Doug R. Nooden, P.E.,Assistant City Engineer ��j <br /> SUBJECT: Amendment to Fire Station Driveway Rehabilitation <br /> City Project OS-09 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution authorizing a <br /> change order to the Fire Station Driveway Rehabilitation, City Project OS-09, in the amount of <br /> $14,888.00 for the reconstruction of the employee parking area and sidewalks for Fire Station#3 <br /> which is located on the Northwest corner of Eldorado and Fairview. <br /> BACKGROUND: <br /> On May 31, 2005 the City Council authorized a $91,832.00 contract with Christy-Foltz, Inc., to <br /> rehabilitate the driveways for Fire Stations #3, #5, #6, and number#7 in order to correct years of <br /> deterioration, engineering deficiencies and safety issues. <br /> These repairs will rectify an existing drainage problem, rehabilitate deteriorated pavement, and <br /> provide a safe means of walking around the structure. The unit prices are per the original <br /> contract amounts and are within the normally expected costs for this type of work. <br /> Allowing Christy-Foltz, Inc., to add this work to their current contract will allow the proposed <br /> extension to occur yet this year and will capitalize on the fact that their forces are currently <br /> mobilized in the area. This authorization will also significantly reduce the staff time necessary to <br /> complete a full set of plans and specifications and bid out the project. Funding is currently <br /> available in the Capital budget for this work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.