Laserfiche WebLink
. <br /> ' HOMER L. <br /> "�-� ����� <br /> ?. �z A�SOCIA'I'E�, LIe�. <br /> �� CONSULTING ENGINEERS <br /> AGREEMENT FOR PROFESSIONAL SERVICES <br /> PROJECT DATA DATE OF CONTRACT September 19, 2005 JOB NO. 5111 <br /> PROJECT NAME Lake Decatur Basin 1 Sediment Storage and <br /> Mobilization Site <br /> LOCATION Macon County <br /> CLIENT City of Decatur <br /> BILLING ADDRESS 1 Gary Anderson Plaza, Decatur, IL 62523 <br /> SCOPE OF SERVICES <br /> The following paragraphs summarize the scope of services to be provided. A detailed breakdown of the scope of services is <br /> shown on the spreadsheets that are included as Attachment A to this Agreement. <br /> Phase 2 Concent DesiQn and Public Information Process. Investigate the possible sites studied by MWH to determine <br /> appropriate design features to be incorporated into the final design. The design concepts to be presented to the public in an <br /> open forum or presentadon type format to gather input on the viability of proposed locations. Refine concepts for possible <br /> second public meeting. Land acquisition to take place during this phase of the project. <br /> Phase 2 Design Plans and Permitting Process. Prepare construction plans, specifications and cost estimates for the <br /> construction of the mobilization sites(s) and sedimentation site for the future dredging of Lake Decatur Basin 1. Prepare, <br /> submit and gain approvals for all required permits for the project. <br /> Phase 3 Construction Administration Observation Testing and Documentation. Provide appropriate staff to perform <br /> construction administration, observation , testing and documentation services for the construction of the sedimentation basin <br /> and mobilization site(s). Provide for construction layout services to Contractor as a part of the contract. Prepare and provide <br /> client with record drawings for project. <br /> AGREEMENT DATA CONTACT: OWNER � AGENT❑ VIA: PHONE❑ LETTER ❑ PERSONAL❑ <br /> NAME Mr. Keith Alexander <br /> TITLE Director of Water Management <br /> START DATE October 1, 2005 COMPLETE DATE April 1, 2008 <br /> FEE BASIS: � HOURLY-SCHEDULE OF RATES IN EFFECT DURING THE PROJECT <br /> (CURRENT RATES ARE ATTACHED AND MADE A PART OF THIS AGREEMENT) <br /> ESTIMATED AMOUNT: $1,041,000. <br /> WE WILL BILL ON A MONTHLY BASIS BY THE 10TH OF THE FOLLOWING MONTH. <br /> TERMS ARE NET DUE UPON PRESENTATION OF INVOICE. <br /> CONDITIONS THE CONDITIONS UNDER WHICH THE ABOVE STATED SERVICES ARE BEING <br /> PROVIDED ARE SET OUT ON THE FOLLOWING PAGES AND ARE INCORPORATED <br /> HEREIN BY REFERENCE. THE ABOVE INFORMATION IS A SUMMARY OF OUR <br /> AGREEMENT FOR PERFORMANCE OF THE WORK DESCRIBED. PLEASE <br /> Page 1 of 6 <br />