Laserfiche WebLink
. . � . <br /> PROJECT PLAN <br /> PROJECT PLAN <br /> A. PRODUCT-Administration <br /> ACTIVITIES: <br /> • Obtain Existing Plans <br /> • Attend Meetings <br /> • Prepare Meeting Minutes <br /> • Prepare Progress Reports <br /> • BWC Project Team Meetings <br /> B. PRODUCT- Field Notes <br /> ACTIVITIES: <br /> • Bridge Inspection - 2 Days <br /> • Coordinate for Boom Lift <br /> • Prepare Summary of Inspection <br /> • Set Benchmark <br /> • Survey Pier Heights and Bottom of Steel Elevations <br /> C. PRODUCT- Bridge Calculations <br /> ACTIVITIES: <br /> • Obtain Bridge Beam Seat Reactions from Existing Plans <br /> • Design Elastomeric Bearings <br /> • Design Expansion Joints at Pier 3 and Pier 6 <br /> • Design Pier 3 and Pier 6- including "corbel" <br /> • Design Fixed Joints at Abutments <br /> • Determine Temporary Support Loading <br /> D. PRODUCT- Bridge Repair Drawings - Pre-Final Bridge Plans <br /> ACTIVITIES: <br /> Prepare the following: <br /> • General Plan Sheet <br /> • Cross Section Sheet <br /> • Expansion Joints - Pier 3 and Pier 6 <br /> • Fixed Joints-Abutments <br /> • Diaphragm Framing Sheet <br /> • Bearing Sheets <br /> • Pier Repair Sheet <br /> • Abutment Repair Sheet <br /> • Temporary Support Sheet <br /> • Clean/Paint Location Sheet <br /> • Compute Bridge Quantities <br /> • Develop Pay Item Worksheet <br /> • Perform QA/QC <br />