Laserfiche WebLink
,1 <br /> _ s <br /> .s , <br /> COUNCIL COMMUNICATION FORM <br /> Engineering& Infrastructure Memorandum <br /> NO. 2005-42 <br /> July 11, 2005 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm ity Manager <br /> Stephen Swan on, P.E.,Director of Engineerin & Infrastructure� <br /> Mathew C. Newell, P.E., City Engine `Z�C� <br /> M. Travis Stanley, Civil Engineer I � <br /> SUBJECT: Country Manor Street Reconstruction, City Project O1-07 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the contract <br /> for Country Manor Street Reconstruction, City Project 01-07, to Beniach Construction Co., Inc., as the <br /> lowest, responsible bidder in the amount of $389,974.76 to reconstruct the street with a concrete <br /> pavement, and that the Mayor be authorized to execute the contract, and the City Clerk to attest. <br /> A second resolution is included herewith that authorizes a change order in the amount of$45,000.00 to <br /> the contract to remove and replace 100% of the curb and gutter on the reconstructed streets. Staff <br /> recommends the approval of this change order. <br /> BACKGROUND: <br /> This project is designed to improve the concrete streets in the Country Manor Estates subdivision on <br /> the City's east side as shown on the enclosed drawing. This work will include the removal and <br /> replacement of the existing concrete pavement with a new concrete pavement over a stabilized sub- <br /> grade. The project includes the removal and replacement of various sections of deteriorated curb and <br /> gutter sections. <br /> Staff inet with many residents of the neighborhood during a public open house on June 7, 2005. All of <br /> the residents were very receptive to street construction proposed for the neighborhood and its traffic <br /> disruption. Many residents at the open house preferred to have the street replaced with concrete rather <br /> than with asphalt. <br /> The project plans and specifications were prepared by Engineering Division staff. The project was <br /> advertised June 17, 2005, and bids were opened on July 8, 2005. The results for the letting are as <br /> follows: <br /> Compared to Compared to <br /> Asphalt Engineer's Est. Concrete Engineer's Est. <br /> Bidder Bid Price Over(-Under) Bid Price Over(-Under) <br /> Engineer's Estimate $409,293.37 ------ $495,731.00 ------ <br /> Beniach Construction Co.,Inc. $343,512.94 (-16.07%) $389,974.76 (-21.33 %) <br /> Otto Baum Company,Inc. $376,613.19 (- 7.98%) $461,917.67 (- 6.82%) <br />