My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-61 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-61 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 2:44:25 PM
Creation date
12/21/2015 2:44:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-61
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT LAKE DECATUR DAM REPAIRS
Approved Date
5/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2005-28 <br /> May 5, 2005 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garma ity Manager / <br /> Stephen Swans n,P.E.,Director of Enginee ing& Infrastructure � <br /> Mathew C. Ne ell, P.E., City Engineer� <br /> Richard N. Berard, Civil Engineer II Ci%� <br /> SUBJECT: Lake Decatur Dam Repairs, City Project 04-20 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Lake Decatur Dam Repairs, City Project 04-20, to J. F. Brennan Co., Inc., as the lowest, <br /> responsible bidder in the amount of$167,675.00, and that the Mayor be authorized to execute the <br /> contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> The City owns and operates the Lake Decatur Dam located on the Sangamon River. The dam was <br /> constructed in 1922 to ensure a reliable source of water for the City's water treatment plants. In <br /> December, 2003, J. F. Brennan Co., Inc., performed an underwater inspection of the upstream <br /> surfaces of the concrete spillway. The inspection report identified a number of deteriorated areas <br /> mainly caused by freeze thaw action. While the current condition of the dam does not pose an <br /> immediate threat to its structural integrity, it would lead to more extensive repairs if not <br /> rehabilitated at this time. <br /> In September, 2004, the City Council awarded an Engineering Services Agreement to Hanson <br /> Professional Services for the preparation of design drawings and specifications for the Lake Decatur <br /> Dam Repair Project. <br /> The project plans and specifications were prepared by Hanson Professional Services. The project <br /> was advertised April 13, 2005, and bids were opened on May 3, 2005. The results for the letting are <br /> as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $ 245,750.00 ---- <br /> J. F. Brennan Co., Inc. $ 167,675.00 (31.8 %) <br /> Pro-Dive, Inc. $ 188,297.00 (23.4 %) <br />
The URL can be used to link to this page
Your browser does not support the video tag.