R2015-139 RECEIVING AND FILING PROPOSED REDEVELOPMENT AGREEMENT Firstech, Inc.
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-139 RECEIVING AND FILING PROPOSED REDEVELOPMENT AGREEMENT Firstech, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2015 8:41:03 AM
Creation date
12/24/2015 8:41:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-139
Res Ord Title
RECEIVING AND FILING PROPOSED REDEVELOPMENT AGREEMENT FIRSTECH, INC.
Approved Date
12/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> Project Costs <br /> FirsTech Busey <br /> SITE <br /> Site Construction(includes infill and paving) $150,000 <br /> Demo of FirsTech Building $200,000 <br /> Demo Auto Bank $50,000 <br /> Sub-Total $350,000 $50,000 <br /> BUILDING <br /> Remodel Dewitt(7,700 sf @ $125/s fl $962,500 <br /> Finish Upgrade for Plaza 2"d Floor(5,500 sf @ $50/s fl $275,000 <br /> Structural Upgrade for Plaza 1S`Floor(2,700 sf @ $15/sfl $40,500 <br /> Drive Up Construction $250 000 <br /> , <br /> Paving $100,000 <br /> Teller Remodel $25.000 <br /> Sub-Total $1,278,000 $375,000 <br /> CONTINGENCY <br /> Design Contingency $80,000 $20,000 <br /> Bid Contingency $80,000 $20,000 <br /> Construction Contingency $80,000 $20,000 <br /> Sub-Total $240000 $60,000 <br /> TOTAL $1,868,000 $485,000 <br /> ARCHITECTURAL FEES/COSTS <br /> Architect/Engineering Design Fees $156,500 $48,500 <br /> Additional Site Observation $2,500 $2,500 <br /> Reimbursable Expenses: <br /> Document Printing $2,500 $2,500 <br /> Construction Testing $2,500 $2,500 <br /> TOTAL $164,000 $56,000 <br /> OTHER COSTS <br /> Technology/Telecom �360,000 $185,000 <br /> Furnishings/Fixtures 150 000 <br /> Drive-Up Equipment �25�500 $11,500 <br /> TOTAL $535,500 $241,500 <br /> OVERALL TOTALS $2,567,500 $782,5000 <br /> TOTAL PROJECT COST: $3,350,000 <br /> CITY OF DECATUR/FirsTech Red.Agreement 24 <br />