My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-60 AUTHORIZING AMENDMENT TO AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-60 AUTHORIZING AMENDMENT TO AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2015 1:39:41 PM
Creation date
12/24/2015 1:39:41 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-60
Res Ord Title
AUTHORIZING AMENDMENT TO AGREEMENT HANSON PROFESSIONAL SERVICE, INC.
Approved Date
5/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL COMMUNICATION FORM <br /> Engineering& Infrastructure Memorandum <br /> NO. 2005-30 <br /> May 5, 2005 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm ity Manager � <br /> Stephen Swans n, P.E.,Director of Enginee ing & Infrastructure <br /> Mathew C. Newell, P.E., City Enginee� <br /> Richard N. Berard, Civil Engineer II �'� <br /> SUBJECT: Amendment to Agreement with Hanson Professional Services, Inc. for <br /> Lake Decatur Dam Repairs, City Project 04-20 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution authorizing an <br /> amendment to an agreement with Hanson Professional Services, Inc., to extend their scope of <br /> work to include construction supervision during the contract for the Lake Decatur Dam Repairs , <br /> for a sum not to exceed $27,300.00, and that the Mayor be authorized to execute the agreement, ! <br /> and the City Clerk to attest. I <br /> BACKGROUND: <br /> In September, 2004, the City Council awarded an Engineering Services Agreement to Hanson <br /> Professional Services for the preparation of design drawings and specifications for the Lake <br /> Decatur Dam Repair Project. The design phase has now been completed. The project was <br /> advertised and bids opened on May 3, 2005. It is proposed to proceed with the construction <br /> phase of the project upon award of the contract. <br /> Given the specialized nature of the project, City staff requires the assistance of a qualified <br /> Engineering Consultant for assistance during construction. Hanson Professional Services, Inc. <br /> submitted an estimate for additional engineering services during construction. City Engineering <br /> is of the opinion that the amount of$27,300.00 is fair compensation for the inspection services to <br /> be provided. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution <br /> and bid award. <br /> INPUT FROM OTHER SOURCES: Deparhnent of Water Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.