Laserfiche WebLink
Project Name: Grand Avenue Sanitary Sewer Repair <br /> Engineer's Estimate Entler Excavating Co., Inc. Bodine Services, Inc. <br /> Project Number: 05-07 819 N. Sunnyside Road 5350 East Firehouse Road <br /> Decatur, IL 62522 Decatur, IL 62521 <br /> City Engineering Division <br /> Bid Date: 5/9/2005 <br /> Time: 10:00 A.M. <br /> Fund: Sewer Fund <br /> Organization Code: 79487906 <br /> Object Code: 461300 <br /> Item# Pay Item QTY Unit Unit Price Total Unit Price Total Unit Price Total <br /> 1 SANITARY SEWER, PVC 10 INCH 50 LF $75.00 $3,750.00 $200.00 $10,000.00 $375.00 $18,750.00 <br /> 2 STORM SEWER, PVC 12 INCH 15 LF $75.00 $1,125.00 $30.00 $450.00 $50.00 $750.00 <br /> 3 EXPLORATORY EXCAVATION 1 EACH $900.00 $900.00 $1,000.00 $1,000.00 $1,400.00 $1,400.00 <br /> 4 MEDIAN REMOVAL AND REPLACEMENT 6 SF $75.00 $450.00 $20.00 $120.00 $90.00 $540.00 <br /> 5 CURB REMOVAL AND REPLACEMENT 4 LF $75.00 $300.00 $50.00 $200.00 $110.00 $440.00 <br /> 6 CLASS B PATCH 10 INCH,TYPE IV 150 SY $150.00 $22,500.00 $70.00 $10,500.00 $98.00 $14,700.00 <br /> �0 <br /> TOTAL BASE BID(AS CORRECTED) �� $29,025.00 $22,270.00 $36,580.00 <br /> Percent Over Under ENGINEER'S ESTIMATE �� -23.27% 26.03% <br /> ALTERNATE 80 CY <br /> A TRENCH BACKFILL-SELECT AGGREGATE MATERIAL $34.25 $2,740.00 $93.75 $7,500.00 $35.00 $2,800.00 <br /> TOTAL BASE BID+ALTERNATE A �� $31,765.00 $29,770.00 $39,380.00 <br /> Percent Over Under ENGINEER'S ESTIMATE �� -6.28% 23.97% <br /> 00 <br /> ALTERNATE 80 CY <br /> B TRENCH BACKFILL-CONTROLLED LOW STRENGTH MATERIAL $65.00 $5,200.00 $127.50 $10,200.00 $60.00 $4,800.00 <br /> TOTAL BASE BID+ALTERNATE B �� $34,225.00 $32,470.00 $41,380.00 <br /> Percent Over Under ENGINEER'S ESTIMATE �� -5.13% 20.91% <br /> � �%� 5 -�- c7 S` <br /> atthew C. Newell, P.E., City Engineer Date <br />