Laserfiche WebLink
. i�2 /- 3r-ol �- <br /> . Illinois Department Final Report, Notice of Completion ar�d <br /> of Transportation Acceptance of Improvement Construc�fed <br /> Under the Illinois Highway Code �' <br /> �� <br /> Municipality City of Decatur The improvement was constructed in accordance with the plans approved by� <br /> Department on 11/28/2005 or as follows: (describe change) ;� <br /> County Macon � <br /> Road District 5 Length as built 66844 Cross Section as built 24 Ft. to 48 Ft <br /> Section 05-00508-00-FP Road Bed Width 24 Ft. to 48 Ft Surface Type Bit. Surt. <br /> Contractor Dunn Co. Width 24 Ft. to 48 Ft Thickness 1 1/2 Inches <br /> Financial Statement <br /> Balance in Authorized Acct <br /> Received for <br /> Total Funds constn,ction Expended For TO BE <br /> Engineering Credited to Credited <br /> R.O.W. Unobligated Unobligated <br /> Source Amount Const. Engr. R.O.W. Balance Balance <br /> MFT 1,566,875.47 1,566,875.47 <br /> $1,566,875.47 $1,566,875.47 <br /> Use only one line for each source of funds,or purpose. Do not make a separate line for each receipt. <br /> Remarks <br /> Submitted ��'2!3 '� ❑ County Engineer -�'j �%��� <br />' �ate � Municipal Engineer <br /> � �3�/,� Summary <br /> Final inspection of the work designated above was made on Item Cost <br />' and it was found to be completed substantially in accordance with all the require- contract• $�,5sa,ao�.sa <br /> ments of the plans, specifications ontra . he fin nci statement is in Final Contract Cost• <br /> accordance with my records. <br /> 1 recommend acceptance by the Department of Transportation. This improvement <br /> shall henceforth be maintained by the City of Decatur <br /> Total Const.Cost*" 1,566,875.47 <br /> Said improvement is hereby accepted by the Department of Transportation. R.o.w. <br /> Engineering <br /> Approved ��CJZ <br /> Dat <br /> i ota!Cost $1,566,875.47 <br /> Submit to Regional Engineer: ' For Day Labor sections use estimated costs here. <br /> 5 copies for Municipal work Re i nal Engineer ** Use actual construction cost regardless Contract <br /> 5 copies for County work or Day Labor construction. <br /> 6 copies for Road District Work <br /> Page 1 of 1 BLR 13510(Rev.7/05) <br /> Printed 11/28/2005 2:34:48 PM <br />