Laserfiche WebLink
Cit of Decatur � <br /> Y <br /> STRAND Page 2 <br /> ASSOCIATES. INC.m , <br /> E N G I N E E R S December 7� ZQ�4 ' <br /> 6. Provide a functional testing check list for approval by Owner prior to startup and <br /> functional testing. <br /> 7. Conduct site visits for startup and functional testing of the new equipment and <br /> SCADA System additions. <br /> 8. Conduct a preliminary inspection with Owner and Contractor and prepare a punch- <br /> list of those items to be completed or corrected before final completion of the <br /> PROJECT. <br /> 9. Conduct a final inspection with Owner to determine if the punch list is completed. <br /> 10. Collect and organize three sets of operation and maintenance data submitted by the <br /> Contractor. Each set will be placed in separate three ring binders, the binders ' <br /> indexed, and a table of contents provided. Binders will be transmitted to Owner. ' <br /> 11. Prepare and submit to OWNER record drawings consisting of one set of drawings in ' <br /> PDF format and one set of drawings in AutoCAD format. Each set of drawings will ' <br /> be provided on a compact disk. Record drawings will be prepared from field , <br /> measurements and markups furnished by the construction Contractor. ENGINEER I <br /> shall not be responsible for the accuracy of the data supplied by others. The ', <br /> Contractors mark-up drawings will also be transmitted to the OWNER. ' <br /> 12. Conduct a warranty inspection with the Owner and Contractor just prior to �, <br /> expiration of the one year warranty period." ', <br /> DELETE item number 5 under Service Elements Not Included. , <br /> CHANGE Compensation as follows: II <br /> ADD in the first paragraph under Compensation on page 4, the ward "Design" prior to the <br /> word Scope. <br /> ADD after the first paragraph under Compensation on page 4, "OWNER shall compensate <br /> ENGINEER for Construction-Related Services on an hourly basis plus expenses for a <br /> limiting fee of$120,000." <br /> CHANGE the second sentence of item 2 under Changes on page 4 to read as follows: "The <br /> lump sum fee and the limiting fee shall not be exceeded without prior notice to and <br /> agreement by OWNER but may be adjusted for time delays, time extensions, amendments, <br /> and changes in the scope of services." <br /> ADD the following sentence to the end of the paragraph under Schedule on page 5: <br /> "It is anticipated that the project will be bid in January 2005 with construction being <br /> completed in January 2006." <br /> SPZ:�hd\S:\(c�Sai\601--650\624\031\Wrd\Amendment l.doc <br />