Laserfiche WebLink
a , <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2004-87 <br /> November 9, 2004 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E.,Director of Engineering & Infrastructurg� <br /> Mathew C. Newell, P.E., City Engineer�� <br /> Richard N. Berard, Civil Engineer II � <br /> SUBJECT: Agreement with Norfolk Southern Corporation for a Water Main <br /> Crossing Permit <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that City Council approve the attached resolution authorizing the <br /> payment of$17,830.00 for an Occupancy Permit from Norfolk Southern Corporation. The <br /> permit is necessary for the construction of a water main extension in Southwest Decatur. <br /> BACKGROUND: <br /> City staff is proposing the construction of a water main extension to improve water pressure <br /> and increase service reliability to the Forest Crest Subdivision in Southwest Decatur. The <br /> Forest Crest Subdivision is presently supplied by a single water main. The proposed water <br /> main extension will provide looping of the water distribution system rectifying an abnormal <br /> number of water main breaks caused by surges in the distribution system. The water main <br /> will run from a 12 inch water main installed recently along State Route 48. From this point, <br /> it will extend across the state route and the Norfolk Southern Railroad and connect to a 6 <br /> inch water main at Forest Crest Drive and Alice Lane. <br /> The proposed crossing under the railroad requires an Agreement for a Pipe Occupancy <br /> Permit from Norfolk Southern. The agreement language is similar to the language used for <br /> other City utilities crossing railroad tracks at various locations. The permitting process has <br /> two phases, namely the application phase and the agreement phase. The initial phase consists <br /> in the submission of plans and specifications along with a non-refundable processing fee of <br /> $1,830.00. Upon approval of the application, a formal agreement is executed along with the <br /> transmittal of a one-time license fee of$16,000.00. <br /> POTENTIAL OBJECTION: There are no known objections to this <br /> resolution. <br />