Laserfiche WebLink
, TR�CK DFIVER ALL 2 24.785 0.000 1.5 1.5 2.0 6.500 2.850 0.000 0. 000 <br /> TRUCK DRIVER ALL 3 24. 985 0.000 1.5 1.5 2. 0 6.500 2.850 0.000 0.000 <br /> TRUCK DRIVER ALL 4 25.235 0.000 1.5 1.5 2.0 6.500 2.850 0.000 0.000 <br /> TRUCK DRIVER ALL 5 25. 985 0.000 1.5 1.5 2. 0 6.500 2.850 0.000 0.000 <br /> TRUCK DRIVER 0&C 1 19.508 0.000 1.5 1.5 2. 0 6.500 2.850 0.000 0. 000 <br /> TRUCK DRIVER 0&C 2 19. 828 0.000 1.5 1.5 2.0 6.500 2.850 0.000 0.000 <br /> TRUCK DRIVER O&C 3 19. 988 0.000 1.5 1.5 2.0 6.500 2.850 0.000 0. 000 <br /> TRUCK DRIVER O&C 4 20. 188 0.000 1.5 1.5 2.0 6.500 2. 850 0. 000 0.000 <br /> TRUCK DRIVER O&C 5 20.788 0.000 1.5 1.5 2.0 6.500 2. 850 0. 000 0.000 <br /> TUCKPOINTER BLD 23.470 24.970 1..5 1.5 2. 0 5.250 5.760 0.000 0.465 <br /> Legend: <br /> M-F>8 (Ovettime is tequired for any hour greater than 8 worked <br /> each day, Monday through Friday. <br /> OSA (Overtime is required for every hour worked on Saturday) <br /> OSH (Overtime is required for every nout �xorked on Sur.day and Holidays; <br /> H/W (Health & Welfare Insurance) <br /> Pensn (Pension) <br /> Vac (Vacation) <br /> Trng (Training) <br /> Egplanations <br /> MACON COUNTY <br /> IRON WORKERS (WEST) - West of a straight line just east of Route 51 to <br /> the southeast corner where Shelby, Macon and Moultrie counties meet. <br /> The following list is considered as those days for which holiday rates <br /> of wages for work performed apply: New Years Day, Memorial/Decoration <br /> Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, <br /> Christmas Day. Generally, any of these holidays which fall on a <br /> Sunday is celebrated on the following Monday. This then makes work <br /> performed on that Monday payable at the appropriate overtime rate for <br /> holiday pay. Common practice in a given local may alter certain days <br /> of celebration such as the day after Thanksgiving for Veterans Day. <br /> If in doubt, please check with IDOL. <br /> Oil and chip resealing (O&C) means the application of road oils and <br /> liquid asphalt to coat an existing road surface, followed by <br /> application of aggregate chips or gravel to coated surface, and <br /> subsequent rolling of material to seal the surface. <br /> EXPLANATION OF CL.�SSES <br /> ASBESTOS - GENERAL - removal of asbestos material from any place in a <br /> building, including mechanical systems where those mechanical systems <br /> are to be removed. This includes the removal of asbestos materials <br /> from ductwork or pipes in a building when the building is to be <br /> demolished at the time or at some close future date. <br /> ASBESTOS - MECHANICAL - removal of asbestos material from mechanical <br /> systems, such as pipes, ducts, and boilers, where the mechanical <br /> systems are to remain. <br /> CERAMIC TILE FINISHE�2, MARBLE FINISHER, TERRA�ZO FINISHER <br /> Assisting, helping or supporting the tile, marble and terrazzo , <br /> mechanic by performing their historic and traditional work assiqnments <br />