My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-99 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-99 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2016 2:56:54 PM
Creation date
1/4/2016 2:56:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-99
Res Ord Title
AUTHORIZING AGREEMENT - ILLINOIS STATE HISTORIC PRESERVATION AGENCY
Approved Date
6/21/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendiz B <br /> Standard Mitigation Measures for Adverse Effects <br /> Program recipients,the City and the SHPO may develop and execute an agreement that includes <br /> one or more of the following Standard Mitigation Measures, as modified by the SHPO, for <br /> undertakings not listed in stipulation V when the SHPO deems it appropriate. <br /> A. Program recipients shall enswe that the historic property is recorded prior to its <br /> Demolition, alteration or relocation in accordance with the Illinois Historic American <br /> Buildings Survey/Historic American Engineering Record(IL HABS/HAER) standards or <br /> a recordation plan developed by the SHPO. At a minimum this plan will establish <br /> recordation methods and standards. The SHPO shall identify appropriate archives for the <br /> deposit of recordation materials and program recipients shall be responsible for <br /> submitting such materials. <br /> B. The City, in consultation with the SHPO, shall identify appropriate parties to receive <br /> salvaged architectural features. Program recipients shall ensure that significant <br /> azchitectural features are salvaged prior to the initiation of demolition activities and <br /> properly stored and curated. When feasible, salvaged architectural features shall be <br /> reused in other preservation projects, if appropriate. <br /> C. Program recipients shall ensure that the treatment of historic properties or the <br /> design of new buildings which cannot feasibly meet the Standards or approved design <br /> guidelines is carried out in accordance with the construction documents or work write- <br /> ups reviewed and approved by Certified Staff and the Commission. <br /> D. Program recipients shall ensure that the marketing plan proposed by the City and the <br /> SHPO is implemented for a mutually agreed upon period prior to the demolition or <br /> relocation of historic properties. Program recipients shall review all purchase offers in <br /> consultation with the City and the SHPO. If a successful purchaser is selected,program <br /> recipients shall include preservation covenants approved by the SHPO in the transfer <br /> deed. If no successful purchaser is identified,program recipients may either convey the <br /> property without covenants or proceed with the demolition or relocation after the historic <br /> properties have been recorded pursuant to IL HABS/HAER standards. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.