My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-70 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-70 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2016 3:39:54 PM
Creation date
1/5/2016 3:39:54 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-70
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT STREET RECONSTRUCTION
Approved Date
5/3/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2004-34 <br /> Apri128, 2003 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garman, City Manager �/ <br /> Stephen Swanson, P.E.,Director of Engineering & Infrastructure��J�"� <br /> Matthew C. Newell, P.E., City Engineer� <br /> SUBJECT: Street Reconstruction, City Project 04-24 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Street Reconstruction, City Project 04-24, to Dunn Company, A Division of Tyrolt, <br /> Inc., as the lowest, responsible bidder in the amount of $1,081,140.35, and that the Mayor be <br /> authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> The Street Reconstruction Program provides a new subgrade and pavement surface in curbed or <br /> non-curbed streets or alleys having existing asphalt pavements that suffered a significant loss of <br /> structural capacity. Streets proposed for this project have existing pavement that is badly <br /> deteriorated through age and use. These pavements can no longer be effectively maintained by <br /> the City's street crews nor can a standard mill and overlay be successfully applied. An additional <br /> goal of the project is to restore any existing curb and gutter to full function wherever possible. <br /> Street reconstruction work involves the removal of the existing street, the construction of a <br /> stabilized base course and the placement of an asphalt surface. This work is generally completed <br /> over the course of one week. A listing of the streets included in this year's reconstruction project <br /> is attached for your information. <br /> The project specifications were prepared by the Engineering Division. The project was <br /> advertised on A ril 8, 2004 and bids were received on A ri126, 2004. The results of the lettin <br /> P P g <br /> are as follows (bid tabulation attached): <br /> Compared to <br />' Engineer's Est. <br /> Bidder Bid Price Over (;Under� <br /> Engineer's Estimate $1,115,151.48 ----- <br /> Dunn Company $1,081,140.35 (-3.05%) <br />
The URL can be used to link to this page
Your browser does not support the video tag.