Laserfiche WebLink
4. Field engineering surveys for the location of lost or buried manholes <br /> � � including horizontal and vertical locations of relocated sewer lines of <br /> which there are no records available. <br /> 5. Emergency work is offered on a 24 hour per day, 7 days per week, with <br /> no more than a finro-hour response time. <br /> D. ASSUMPTIONS/CONDITIONS <br /> This Agreement is subject to the following assumptions/conditions: <br /> SCHEDULE <br /> It is anticipated that the T.V. Inspection survey will take place from May 1, 2004 through <br /> April 30, 2005 for the estimated 200,000 L.F. Any additional footage to be televised or <br /> smoke testing, manhole evaluations and other services we are asked to perform will be <br /> completed in a timely manner as agreed to by the City Engineer. <br /> E. ACCEPTANCE OF CONDITIONS STATEMENT <br /> Tele Scan, Inc. hereby affirm that they are in full acceptance of all conditions and <br /> requirements and are prepared to execute an agreement with the City of Decatur and <br /> perform these services accordingly. <br /> 1. The work shall be performed in compliance with applicable OSHA requirements. <br /> 2. All insurance requirements shall be met. <br /> F. SUBCONTRACTORS <br /> Tele Scan, Inc. plans to perform all the services required in this proposal. i <br /> G. PROJECT TEAM I <br /> The initial Project team shall be as follows. If any of these persons become unavailable, <br /> TSI will substitute persons with similar qualifications. <br /> NAME JOB TITLE <br /> John S. Latshaw President <br /> Donald D. Latshaw Technical Consultant <br /> Am Ta lor Pro�ect Technician <br /> Richard Worsham Pro�ect Technician <br /> R an Owens Pro'ect Technician <br /> 4 <br />