Laserfiche WebLink
V <br /> ITEM PAY 1TEM QUANTI UNIT UNIT PRICE TOTA� UNIT PRlCE TOTAL UNIT PRICE TOTAL UNIT PRIGE TOTAL <br /> NUMBER <br /> 44201729 Class D Patches,Type 2,7 Inch 100 SY $64.00 56,400.00 $43.30 $4,330.00 $66.82 $6,682.00 $66.40 $6,640.00 <br /> 44201733 Class D Patches,Type 3,7 Inch 300 SY $60.00 $18,000.00 $43.30 $12,990.00 $59.43 $17,829.00 $66.40 519,920.00 <br /> 44201735 Class D Patches,Type 4,7 Inch 400 SY $45.00 $18,000.00 $43.75 $17,260.00 $50.73 $20,292.00 $66.40 $26,560.00 <br />' 48100100 Aggregate Shoulders Type A 100 TON $25.00 $2,500.00 $45.25 $4,525.00 $46.99 $4,699.00 $27.27 $2,727.00 <br /> 48200300 Bituminous shoulders 5" 28,000 SY $13.00 $364,000.00 $11.15 $312,200.00 $12.53 $350,840.00 $12.64 $353,920.00 <br /> 60239100 Inlet Type A Special with Type III FR.&GR. 5 EA $1,050.00 $5,250.00 $925.55 $4,627.75 $782.40 $3,912.00 $933.96 $4,669.80 <br /> 60255500 Manholes to be Adjusted 60 Ea $140.00 $8,400.00 $127.05 $7,623.00 $127.82 $7,669.20 $284.98 $17,098.80 <br /> 60255800 Manhole Adj.w/New T1 Fr&Lid 40 EA $575.00 $23,000.00 $599.20 $23,968.00 $532.17 $21,286.80 $556.81 $22,272.40 <br /> 60266600 Valve Box Adjustment 50 EA $115.00 $5,750.00 $10.90 $545.00 $100.19 $5,009.50 $139.73 $6,986.50 <br /> 60300410 Valve Box Frames to be Adjusted with New Frames 20 EA $275.00 $5,500.00 $283.55 $5,671.00 $271.45 $4,229.00 $255.13 55,102.60 <br /> 70300200 Temp.Pavement Marking 900 LF $0.75 $675.00 $0.60 $540.00 $0.45 $405.00 $1.15 $1,035.00 <br /> 84700100 Detector Loop T1 1,500 L.F. s10.00 $15,000.00 $9.90 $14,850.00 $10.95 $16,425.00 $13.80 520,700.00 <br /> X4066414 Superpave,Mix"C",N50 Bituminous Conc.Surf. 920 TON $47.35 $43,562.00 $43.50 540,020.00 $47.22 $43,442.40 $50.29 546,266.80 <br /> Cse. <br /> X4066424 Superpave,Mix"D",N50 Bituminous Conc.Surf. 4,500 TON $47.90 $215,550.00 $46.00 $207,000.00 $49.46 $222,570.00 $47.16 $212,220.00 <br /> Cse. <br /> X4066490 Bit Con Surf Cse,Super IL-9.5L(Low ESAL) 14,500 TON $47.07 $682,515.00 a41.15 $596,675.00 $46.80 $678,600.00 546.12 $668,740.00 <br /> TOTAL B�D As Corrected $2,107,177.00 $2,008,079.75 $2,176,343.50 $2,212,773.90 <br /> Percent Over or Under ENGINEER'S ESTIMATE -4.70% 3.28% 5.01°/a <br /> � y-/y-v� <br /> Matthew C. Newell, P.E., City Engineer Date <br />