Laserfiche WebLink
� ' • HO\4ER L <br /> �1 .A�� 1�i11 V <br /> 8: ASSQCIAT�S� L�.P 5 N.COUNTRY CLUB ROAD 217-422-8544 <br /> CONSULTING ENGINEERS DECATUR,ILLINOIS 62521 FAX:217-422-0398 <br /> i�l�rch 24, 2004 <br /> Keith Alexander <br /> Director of Water Management <br /> One Gary K. Anderson Plaza <br /> Decatur, IL 62523 <br /> Re: Supplement No. 3 <br /> Sediment Basin Project HLC No. 4572.03 <br /> �����:`,•� �ct'`�c. �g�� <br /> Dear Keith: <br /> We are herein requesting Supplement No. 3 to our existing contract for the construction <br /> observation work completed at the Mobilization and Sediment Basin sites in 2003. Our <br /> records show the completion of all construction work was July 12, 2003. This supplement <br /> is for additional work performed by our staff due to the contract being extended beyond <br /> the anticipated completion date of fa112C102. <br /> We informed City of Decatur staff of the need for this su�plerrient during this period of <br /> the project. This supplement has been in process for the past yeax and has been held from <br /> being submitted due to the need to close out various construction issues on the project. <br /> These issues dealt primarily with completing the observation work, the disposal of tree <br /> debris from the project site, Contractor authorizations, erosion control issues at the Bolt <br /> property, construction of the mobilization site access road, preparation of final record <br /> drawings,required closeout meetings with pernutting and local agencies having juris- <br /> diction over the sedimentation site and final record transfers to the City of Decatur. <br /> These issues are now complete and for this reason, this request is being made at this time. <br /> The supplement covers additional costs incurred during 2003 by Homer L. Chastain & <br /> Associates (HLC) and our sub-consultants Hanson Professional Services, SKS Engineers, <br /> Dredging Specialists and Architechiral Expressions. Our contract for this work had <br /> anticipated all work for the project being completed in late 2002 with the closeout of <br /> project documentation to take place in early 2003. The actual time frame for the <br /> additional work performed by HLC occurred from mid February through the end of <br /> October 2003. Our staff was used on site through July to ensure the construction work <br /> was performed to the lines, grades and specifications of the contract documents with tinal <br /> docuinentation of all work completed in August through October. <br /> HLC continued to invoice the City of Decatur during this time frame to keep City staff <br /> aware of what costs would be necessary for this supplement. All charges to the City of <br /> Decatur ended as of October 31, 2003 and were included in our Fi�al Invotce ivo. 15 <br />