|
t
<br /> 6. The City will assume, at it's expense, all cost to repair or replace all parts and
<br /> components normally consumed in day-to-day operations such as: tires, tubes, tire repairs,
<br /> lubricating oil, filters of all types, grease, fuel, anti-freeze, cutting edges, batteries, headlights,
<br /> glass breakage, wire rope, belts, brake linings, cleaning, painting, jet rodder hose, suction hose
<br /> and pipe, valves, electrical parts, clamps, gaskets, nozzles and repair fittings.
<br /> 7. Coe shall have a parts availability policy to supply the City with new parts within
<br /> 48 hours (excluding Saturday, Sunday and holidays) or will furnish the parts upon request at no
<br /> cost. Parts covered in this guarantee are those new parts required for normal repairs and
<br /> maintenance necessary to keep the machine operating in a day-to-day operation.
<br /> 8. The City will maintain equipment in accordance with normal published
<br /> manufacturer's recommendations.
<br /> 9. Coe has the right to inspect equipment during normal working hours at the City
<br /> and make recommendations for repairs, improved maintenance, etc., in keeping with the
<br /> requirements stated by the manufacturer in the shop manual for the maintenance and repair of the
<br /> piece of equipment.
<br /> 10. Coe will be fully responsible for the total cost of all repairs (other than in
<br /> Paragraph 6) to the equipment on the following Power Train items, in excess of the guaranteed
<br /> maximum cost of repairs (as indicated on Exhibit A) for the time of operation in hours, or period
<br /> of time in years, from the date of delivery, whichever occurs first (as indicated on Exhibit A).
<br /> , , , , , , l�t�,
<br /> , � , , , , d''C
<br /> , , � M(
<br />
|