My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-43 AUTHORIZING EXECUTION OF AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-43 AUTHORIZING EXECUTION OF AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 8:55:18 AM
Creation date
1/6/2016 8:55:18 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-43
Res Ord Title
AUTHORIZING EXECUTION OF AGREEMENT BARR & ROBISON SEWER AND EXCAVATING, INC. STORM SEWER REPAIR AT EAST NORTH & NORTH CALHOUN STREETS
Approved Date
3/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M • <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2004-23 <br /> March 5, 2004 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E., Director of Engineering & Infrastructure���� ' <br /> Matthew C. Newell,P.E., City Engineer� <br /> SUBJECT: Storm Sewer Repair at Intersection of East North & North Calhoun Streets <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution authorizing the <br /> City Manager and the Director of Engineering and Infrastructure to enter into an agreement with <br /> Barr & Robison Sewer and Excavating, Inc., to repair a storm sewer at the intersection of East <br /> North Street and North Calhoun Street. The resolution authorizes an expenditure of up to <br /> $25,000 for the work. <br /> BACKGROUND: <br /> During the preliminary work as part of the City's 2003 street restoration project, it was <br /> discovered that a section of the North Calhoun Street 24" storm sewer had significant mineral <br /> deposits similar to concrete. These deposits fill nearly half of the pipe and created a blockage in <br /> the storm line. A portion of the filled in section of pipe was located beneath an SBC manhole. <br /> Any work on the sewer pipe requires the removal and replacement of the SBC structure. <br /> City staff contacted SBC and a joint decision was made to request Barr & Robison to submit a <br /> quote for removing and replacing the SBC manhole and removing and replacing the filled in City <br /> storm sewer. SBC agreed to pay for the removal and replacement of their manhole. <br /> This portion of North Calhoun Street is scheduled to receive and asphalt overlay during the 2004 <br /> construction season. This repair work must precede the proposed street work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.