My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-35 AUTHORIZING THE EXECUTION OF A PROPOSAL
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-35 AUTHORIZING THE EXECUTION OF A PROPOSAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 9:37:10 AM
Creation date
1/6/2016 9:37:10 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-35
Res Ord Title
AUTHORIZING THE EXECUTION OF A PROPOSAL FOR SURVEY WORK LAKE DECATUR BASIN 6 DREDGING
Approved Date
3/1/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � <br /> DEPARTMENT OF WATER MANAGEMENT <br /> Memorandum No. 2004 - 02 <br /> February 23, 2004 <br /> TO: Honorable Mayor and City Council <br /> FROM: Steve Garman, City Manager <br /> John A. Smith, Assistant City Manager far Public Services <br /> Keith D. Alexander, Director of Water Management � <br /> SUBJECT: Lake Decatur Basin 6 Dredging, City Project 9956 <br /> Proposal for Survey Work <br /> SUMMARY RECOMMENDATION: <br /> Council adopt the attached Resolution authorizing a proposal with H. L. Chastain & Associates, <br /> LLP, to perform survey work on a time and material basis at an estimated cost of$23,692. <br /> BACKGROUND: <br /> The City's dredge has a computerized dredge production and geographic location system named <br /> WINOPS. When fully utilized, WINOPS continuously monitors dredge production rates and the <br /> dredge's exact location as it removes lake sediment. This is important to document the dredge <br /> operator's productivity, to determine exactly where the sediment is to be removed, and to <br /> provide accurate project reporting to State and Federal regulatory agencies. The proposed survey <br /> work will collect, assemble and input the data required by the WINOPS system. <br /> POTENTIAL OBJECTIONS: <br /> None foreseen. <br /> INPUT FROM OTHER SOURCES: <br /> Dredging Supply Company- the firm that built the City's dredge. <br /> STAFF REFERENCE: <br /> Keith D. Alexander, Director of Water Management, telephone 424-2863 <br /> e-mail kdalexander@decaturnet.org <br /> Stephen E. Yeager, Water Services Manager, telephone 875-5704 <br /> e-mail seyeager@decaturnet.org <br /> BUDGET/TIME IMPLICATIONS: <br /> Funding is available in the Lake Capital Fund. The survey should be completed to coincide with <br /> the startup of dredging this spring. <br /> cc: Stephen E. Yeager <br /> Gregg Foltz, H. L. Chastain &Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.