Laserfiche WebLink
Kaydon Drive Relief Sewer Engineer's Estimate HCS Lynch Siciliano,Inc. Entler Excavating Co.,Inc. Burdick Plumbing Colclasure,Inc. <br /> City ProJect 2003-10 Construction,Inc. 3650 Winchester Road 819 N.sunnyside Road 8 Heating Co.,Inc. 3006 Gill Street,Suite E <br /> City Engineering Division PO Box 258 Springfield,IL 62707 Decatur,IL 62522 728 South Main Street Bloomington,IL 61704 <br /> Witt,IL 62094 Decatur,IL 62521 <br /> Bid Date.. Thursday,February 5,2004 <br /> Time.. 10:00 a.m. <br /> SewerFund <br /> Organizational 8 Object Code..................79487906-461300 <br /> ITEM PAY ITEM QUANTITY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL <br /> NUMBER <br /> 1 Drop Manhole MH-1 with Stack,Frame&Casting 7 LS 59,000.00 =9,000.00 ;2,750.00 :2,750.00 55,114.00 =5,174.00 S8>�0.00 58,�0.00 j3,200.00 53,200.00 514,000.00 S74,000.00 <br /> 2 Drop Manhole MH-2 with Stack,Frame&Casting 7 LS S3,000.00 53,000.00 s2,150.00 =2,150.00 Sz,894.00 E2,894.00 54,500.00 :4,500.00 j1,250.00 51,250.00 j3,750.00 53,750.00 <br /> 3 Connection to Manhole MH-3 1 LS 51,000.00 E7,000.00 j1,500.00 51,500.00 5920.00 $920.00 S2,000.00 j2,000.00 51,000.00 51,000.00 $1,400.00 51,400.00 <br /> 4 70"Sankary Sewer with Trench Backfill 27 LF 5�.00 j1,350.00 :50.00 57,350.00 f85.80 $2,316.60 j75.00 j2,025.00 E53.00 $1,431.00 S65.00 ;7,755.00 <br /> 10"Sanitary Sewer with 18"Casing Pipe Bored& <br /> 5 Jacked into Place wkh End Seals and Casing 88 LF Sz75.00 524,200.00 5�5.00 j79,800.00 5295.00 Sz5,960.00 5220.00 519,360.00 $275.00 S24,200.00 ;325.00 s28,600.00 <br /> Spacers <br /> 6 70"Sanitary Sewer with Compacted Backfill 53 LF s40.00 s2,120.00 S�.00 5z,014.00 s56.40 E2,989.20 565.00 :3,445.00 529.00 s1,537.00 547.00 j2,491.00 <br /> � 86.18 Curb 8 Gutter Removal&Replacement as � LS E800.00 s800.00 5350.00 5350.00 s975.00 5975.00 s2,000.00 $2,000.00 51,250.00 S1.250.00 s450.00 :450.00 <br /> Necessary <br /> $ Pavement Patching,Removal&Replacement as 1 LS s4,000.00 s4,000.00 s2,500.00 $2,500.00 51,470.00 57,470.00 52.100.00 S2,700.00 E1,750.00 51.750.00 57,000.00 51,000.00 <br /> Necessary <br /> 9 Seeding,Cleanup,Demobilization and any other � LS S13,330.00 573,330.00 52,500.00 52,500.00 53,248.00 53,248.00 55,000.00 :5,000.00 ;17,000.00 577,000.00 =3,500.00 E3,500.00 <br /> item called out,but not tn any other bid item <br /> TOTAL BID As Corrected s58,800.00 534,914.00 s45,886.80 s48,930.00 S52,618.00 $56,946.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE -40•62°/. -21.96% -16.79'/. -10.51Y. -3.15•/. <br /> �G�z� Z-9-�'`� <br /> Matthew C. Newell, P.E., City Engineer Date <br />