My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-12 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-12 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 10:34:26 AM
Creation date
1/6/2016 10:34:24 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-12
Res Ord Title
AUTHORIZING AGREEMENT ILLINOIS COMMERCE COMMISSION WOODFORD STREET / NORFOLK SOUTHERN RAILWAY COMPANY RAIL GRADE CROSSING PROTECTION IMPROVEMENTS
Approved Date
2/2/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA1072 Exhibit A <br /> Page 2 <br /> VISIBILITY STUDY: See Location Sketch <br /> Train S eed 10 MPH <br /> Roadway Speed 30 MPH <br /> Required Stoppin Si ht Distance (SSD) <br /> Alon Roadwa 221 FEET <br /> Alon Tracks 99 FEET <br /> Required Clearing Sight Distance (CSD) 240 FEET <br /> (Alon Tracks) <br /> Distances calculated per American Association of State Highway and Transportation Officials(AASHTO),A Policy on � <br /> Geometric Design of Highways and Streets, 2001, Fourth Edition. ' <br /> UADRANT CSD OBSTRUCTI N <br /> Q O SSD OBSTRUCTION <br /> (FT) (FT) <br /> NE >240* * 70 Wooden fence <br /> NW >240� * 30 Rock piles, etc. <br /> SE >240* * OK <br /> SW >240* * 30 Storage of large wire <br /> *Note: Automatic flashing light signals and gates(AFLS&G)eliminate the need to satisfy minimum Site Distance criteria. <br /> APPROACH GRADES: See Location Sketch <br /> DIRECTION: NORTH DIRECTION: SOUTH <br /> DISTANCE ELEVATION GRADE DISTANCE ELEVATION GRADE <br /> (FT) (FT) (% (FT) (FT) (%) <br /> 25 100.1 +0.4 25 99.9 0.4 <br /> 50 100.2 +0.4 50 99.7 0.8 <br /> Distance measured from outermost rail. <br /> COMMENTS: <br /> Round figure estimate is $155,600 <br /> This crossing has experienced accidents in the past 15 years with no fatalities in 2002, 1999, 1990, <br /> and 1989. In December of 2003 there was a possible close call (the driver called this in to our office <br /> on 12-10-03). We suggested to the railroad stop and flag this crossing (in lieu of AFLS&G) but they <br /> are not willing, so we have to install AFLS&G's. <br /> Railroad needs to cut the trees and brush in the NE and NW quads. They also need to remove and <br /> replace the asphalt transition strips adjacent to the rubber crossing surface, as they are deteriorating <br /> and causing a rough ride. The east ped asphalt also needs to be repaired. <br /> Page three will be the Location Sketch (Aerial Photo) of the crossing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.