My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-204 AUTHORIZING EXECUTION OF AGREEMENTS
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-204 AUTHORIZING EXECUTION OF AGREEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 11:11:16 AM
Creation date
1/6/2016 11:11:15 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-204
Res Ord Title
AUTHORIZING EXECUTION OF AGREEMENTS TEEN CHALLENGE - PUBLIC FACILITY GRANT PROGRAM - DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
Approved Date
12/15/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 05 z203 15�04 FR T A BRINKOETTER 2174239862 TO 4239118 P.01i01 <br /> T. A. BRINK�ETTER � SaNS, INC. �.��►���N� <br /> 636 EAST WOOD STREET P.O.BOX 1127 <br /> D�CATUR, ILLINOlS 62525 �� <br /> PHONE:217/423-3493 <br /> FAX:2171423•9862 <br /> E-MAIL:infoQtabrEnkoetter.com <br /> �(ovember 20,2003 <br /> Susan Brown <br /> Teen Challenge International <br /> 151 West Prairie <br /> Decatur,Il1in.ois 62523 <br /> RE: HEeating Repairs and N�od.ificatian <br /> Dear Susan: <br /> We propose ta fLunish ihe foilawing heating repairs and modiffcations as described below <br /> for thc sum of Seventy Five Thonsand Eight�Yundred Eighty�ye Dallars <br /> ($75,885.00). We are suggesting that this is a basic outline of inechanical repairs needed <br /> at this time and possible additional work will ba required in the future_ <br /> Heatin� and Temnerature Controls <br /> The above price includes the following. <br /> 1. Furnish a�id install approximately 46 steam traps the have been idenYified anci <br /> faulty. <br /> 2. Furnish and install a temperature contral systam located in the basement that will <br /> allow eontrol of steam zones and add additional staging ofboilers. <br /> 3. Repair approximatcly 8 steam valvcs that ha�•c dcvelopcd lcaks in the boilcr <br /> room. <br /> 4. Repair existing condensatc piping system that has deteriorated and corrodcd <br /> inside piping causing blockage and not allowing adequate heat in several. areas of <br /> thc building. <br /> 5. Furnish and install the proper steam relief valves for the boilers that wcre installed <br /> improperly by provious heating contractor. <br /> The abova iterns are the most criticaJ at tlxis time. Additional work wiil also be <br /> needed to upgrade boilers to furnish heating to building. Without the above <br /> referenced repairs the building will not operate properly. <br /> Respectfully Submitted, <br /> Russ Bodine <br /> T. A. Brinkoettcr and Sons, Inc. <br /> PLUMBIIVG-HEATING—AIR CONDITIONtNG <br /> PROCESS PIPING--51tEET NETAL— VENi'fILAT14N—RE�liiGERATiON <br /> BERV(NG THE NEEDS OF INDUSTRY AND COMMERCE S1NCE 1914 <br /> F.IDATAIRUSS�JOBLTRS1Te0t;CI1a11�1.hsetmodiAeatia�a.DOG <br /> ** TOTAL FAGE,�'1 ** <br />
The URL can be used to link to this page
Your browser does not support the video tag.