Laserfiche WebLink
- -JUL-15-2003 11�49 BODINE ELECTRIC 217 420 4283 P.eli02 <br /> � <br /> Bod�ne Ele�tric <br /> OF DECATUR <br /> � � <br /> ;�,,:�-;::�': <br /> ESTAHLISHED 1918 1848 North 22"° Stzeet - P.O. <br /> Sox 976 - Decatux, IL 62525 - c21�1 923-2593 <br /> July 15, 2003 <br /> Larry Bafford <br /> Christy Fo�tz <br /> imate for 2 r.ew Gaitronics desk s�ts er a re uest <br /> Re: Est p q <br /> from Rob Sk�irley. <br /> Dear Sir: <br /> Bodine Electric is pl.eased to quote the lump sum price of <br /> $996.00 for the project referenced 3}JOVE. <br /> $866. 00 Material � <br /> 5130.00 Overhead/Profit � <br /> $996.00 Total <br /> We will furnish 2 new Gaitronics model 7265-101 desktop <br /> units. The existing units are not compatible with the <br /> equipment that is currently being manufactuzed. Gaitronics <br /> does not offer a means of adapting �he old units. <br /> This estimate is based on all work being done during our <br /> normal workday and workweek. <br /> Use of this quotation is based upon the understanding that <br /> Bodine Elec�ric has necessarily assumed certain conditions <br /> in ord�r to arrive at its best estimate for doing the work. <br /> In the event that actual conditians significantly vary rrom <br /> our assumptions, then a fair adjustment to the price is <br /> expected. These include: <br /> - Physical conditions significantly different than could be <br /> determined from a reasonable inspection of the Worksite <br /> and/or informati.on supplied by the customer. <br />