Laserfiche WebLink
� <br /> fully consumed in the performance of the Work;and cost(less salvage value)of such items if not <br /> fully consumed,whether sold to others or retained by the Contractor. Cost for items previously <br /> used by the Contractor shall mean Eair market value. <br /> 7.5.2 Rental charges for temporary facilities> machinery> equipment, and hand tools not <br /> customarily owned by construction workers that are provided by the Contractor at the site, <br /> whether rented from ihe Contractor or others, and costs of transportation> installation, minor <br /> repairs and replacements,dismantling and removal thereof. Rates and quantities of equipment <br /> rented shall be subject to the Owner's prior approval. <br /> 7.5.3 Costs of removal of debris from the site. <br /> 7.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone <br /> calls>postage and parcel delivery charges>telephone service at the site and reasonable petty cash <br /> expenses of the site office. <br /> 7.5.5 That poriion of the reasonable expenses of the Contractor's personnel incurred while <br /> traveling in discharge of duties connected with the Work. <br /> 7.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable <br /> location,if approved in advance by the Owner. <br /> 7.6 MISCELLANEOUS COSTS <br /> 7.6.1 That portion of insurance and bond premiums that can be directly attributed to this <br /> Contract <br /> 7.6.2 Sales, use or similar taxes imposed by a governmental authority that are related to the <br /> Work. <br /> 7.6.3 Fees and assessments for the building permit and for other permits, licenses and <br /> inspections for which the Contractor is required by the Contract Documents to pay. <br /> 7.6.4 Fees of laboratories for tests required by the Contract Documents,except those related to <br /> defective or nonconforming Work for which reimbursement is excluded by Subparagraph i3.5.3 of <br /> AIA Document AZoi-i9g7 or other provisions of the Contract Documents,and which do not fall I <br /> within the scope of Subparagraph 7.7.3. <br /> 7.6.5 Royalties and license fees paid for the use of a particular design, process or product <br /> required by the Contract Documents; the cost of defending suits or claims for infringement of <br /> patent rights arising from such requirement of the Contract Documents;and payments made in <br /> accordance with legal judgments against the Contractor resulting from such suits or claims and <br /> payments of settlements made with the Owner's consent.However,such costs of legal defenses, <br /> judgments and settlements shall not be included in the calculation of the Contractor's Fee or <br /> I I�� subject to the Guaranteed Maximum Price.If such royalties,fees and costs are excluded by the last <br /> sentence of Subparagraph 3.i7.i of AIA Document AZoi-ig97 or other provisions of the Contract <br /> �' ' Documents,then they shall not be included in the Cost oE the Work. <br /> o. o <br /> oo.�o0 <br /> O <br /> 0 1 9 9 7 A I A� 7•6.6 Data processing costs related to the Work. <br /> AIA DOCUMEN7 A111-1997 <br /> OWNER-CONTRACTOR 7.6.7 Deposits lost for causes other than the Contractor's negligence or failure to fulfill a <br /> AGREEMENT SPecific responsibility to the Owner as set forih in the Contract Documents. <br /> The American I�stitute <br /> of Architects <br /> 1735 New York Avenue,N.W. <br /> Washington,D.C.20006-5292 <br /> WARNING:unlicensed ohotocopvinR violates US.copyright laws and will subject the violator to legaf prosecution. <br />