Laserfiche WebLink
RIDER TO STANDARD FORM <br /> OFAGREEMENT BETWEEN OWNERAND CONTRACTOR WHERE THE BASIS FOR PAYMENT IS <br /> THE COST OF THE WORK PLUS A FEE WITH A NEGOTIATED GUARANTEED MAXIMUM PRICE <br /> AIA DOCUMENT Alll-1997 <br /> This Rider is attached to the Standard Form of Agreement between Owner and Contractor Where the Basis <br /> for Payment is the Cost of the Work Plus a Fee with a Negoriated Guaranteed Maximum Price, AIA Document <br /> Alll-1997 Edition, as modified ("Standard Form") between East Lake/Decatur, LLC, an Illinois limited liability <br /> company ("Owner") and Entler Excavating Co., Inc. ("Contractor"), dated v u 2 , 2003. If any term or <br /> condition of this Rider conflict with the terms and conditions set forth in the S dard Form Agreement, the terms <br /> and conditions of this Rider shall control. The term"Agreement" shall be deemed to include the provisions of this <br /> Rider,unless the contract clearly indicates to the contrary. Paragraph references in this Rider refer to the paragraphs <br /> contained in the Standard Form. <br /> Provision Chan�e <br /> Article 1 Following the first paragraph in Article 1,the following is hereby inserted: <br /> "Contractor shall maintain at the Site for Owner, Architect and Project Manager, one <br /> record copy of all drawings, specifications, addenda, Change Orders and other <br /> modifications, in good order and marked currently to record all changes made during <br /> construction and approved shop drawings, product data and samples. Contractor shall <br /> record on the record copy final locations of underground lines by depth from finish <br /> grade and by accurate horizontal offset distances to permanent surface improvements. <br /> Contractor shall require all Subcontractors as part of their Subcontracts to furnish as- <br /> built drawings complying with the foregoing requirements. All of the items shall be <br /> delivered to Owner upon complerion of the Work." <br /> 4.3 Following Paragraph 43,the following are hereby inserted: <br /> "4.4 By executing this Agreement, the Contractor conf'irms that the Contract Time <br /> includes an allowance for normally adverse weather and is a reasonable period for <br /> performing the Work. <br /> 4.5 Contractor agrees to adhere to the Project Schedule set forth in Exhibit E or as <br /> modified in accordance with Paragraph 12.13.2 in performing the Work, and material <br /> deviation therefrom shall be a breach by the Contractor of this Agreement. <br /> 5.1.2 Insert at the end of the first sentence: <br /> "The Contractor's Fee shall consist of the aggregate of the following percentages of the <br /> Cost of the Work: <br /> For Home Office Overhead 2% <br /> For General Job Condirions 6% <br /> For Profit 6% <br /> TOTAL 14% <br /> The Contractor's Fee includes profit, home office/general overhead costs, General Job <br /> Conditions (as defined in Exhibit B annexed hereto) and any other costs (including <br /> overtime unless approved in writing in advance by the Owner) incurred by the <br /> Contractor in connecrion with the Work not expressly payable to the Contractor under <br /> 1 <br /> Doc#:CHI01 (239130-00107)50130735v3:08/12/2003/Time:10:48 <br />