My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-163 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-163 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 3:07:45 PM
Creation date
1/6/2016 3:07:44 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-163
Res Ord Title
AUTHORIZING AGREEMENT ILLINOIS CENTRAL RAILROAD KAYDON DRIVE RELIEF SEWER CONSTRUCTION
Approved Date
10/20/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SS-i BORING aND .JACKING CNIC RaILROaD <br /> � <br /> At the location where the 10" sewer crosses the CNIC Railroad the ptans call fo�the <br /> sewer to be installed inside an 18" steei casinQ pipe. The steel casina pipe shall �e dry <br /> bored and jacked into place. The contractor shall continually check the line and'I,7rade <br /> while borinv and immediately be�in to correct anv deviations. <br /> The unit price in the proposal shall include the 10" sewer pipe. 18"casin�pipe, casina <br /> spacers, end seaIs. bore pit construction. sheetinQ. disposal of spoil, and all other <br /> materials, equipment and labor associated with the installation of the sewer and �asinv <br /> P�Pe• ! .. <br /> �ttached. as E:chibit :�. is a copy of the License to cross the Canadian National ITlinois <br /> Central Ri�ht of Wav. Th� Contractor shall fullv comply �.vith the requirements of the <br /> license. The O�vner has paid the one time license fee. The Owner w•ill reimbursa the <br /> Contractor for the cost charged by the railroad for an inspector. , <br /> The casin`_ pipr shall be steel pipe with 0.;1? inch wall thicl:ness. 3�.000 psi mir�imum <br /> vield point. welded ste�l. The Joints shall be continuous welded. <br /> The ends of the casina pipe shall be sealed to the carrier pipe b� the use of a vlod�el C- ' <br /> Custom Pull On S�al as manufactured bv Pipeline Seal and Insulator. Inc. or equ�l. , <br /> If there are anv voids outside [he casinQ pipe sreater than 1", the outside of the ca�in, ' <br /> pipe shall be `lrouted �vith li�htw•ei:ht vrout. � 'i <br /> The carrier pipe shall be center restrained bv usin�7 casin_ spacers. The spacers sl�all be a I <br /> maximum of-� feet apart. and spacers shall be placed 1 fout on either side of each jjoint. <br /> Spacers shall be installed on the same orientation. The spacers shall be RACI tvp� P;Q <br /> as marketed bv Pub(ic Works �tarketin�. Plano. TX or PSI Casin, Spacers �Iode(''C8G-�' ; <br /> as manufactured b� Pipeline Szal 8c Insulator. Inc. Huston. TjC or equal. �'I <br /> I <br /> SC-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.