Wate�Main Extension/Replacement Engineer's Estimate Bodine Services,Inc. Burdick Plumbing Entler Excavating Co.,Inc. Hoerr Construction,Inc.
<br /> City Project 2003-01 5130 E.Firehouse Road &Heating Co.,Inc. 819 N.Sunnyside Rd. PO Box 10195
<br /> Clty Engineeri�g Division Decatur,IL 62521 728 South Main Decatur,IL 62522 Peoria,IL 61612
<br /> Decatur,Illinois 62521
<br /> Bid Date.. Tuesday,August 5,2003
<br /> Time.. 10:00 a.m.
<br /> Water Operating CapiWl ProJects
<br /> ACCOUNT NO.:................................................................. 80�1000-867
<br /> ENG.CODE:............................................................................. WO 2003-01
<br /> ITEM PAY REM QUANTITY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
<br /> NUMBER
<br /> 76 121nch Plug MJ 1 EA 5175.00 E175.00 5155.00 =155.00 E150.00 5150.00 5175.00 5175.00 5320.00 5320.00
<br /> 77 61nch Plub MJ 2 EA 5125.00 SZ50.00 5125.00 5250.00 5100.00 5200.00 575.00 5150.00 5250.00 5500.00
<br /> 18 Ftre Hydrant 2 EA j1,550.00 53,700.00 51,620.00 53,240.00 51.600.00 E3,600.00 51,800.00 =3,600.00 51.900.00 53,800.00
<br /> 19 6 Inch Sleeve(Restnined) 7 EA 5450.00 5450.00 5250.00 5250.00 5500.00 E500.00 ES00.00 s800.00 5275.00 5275.00
<br /> 20 12 Inch Grip Ring Accessory Kit 28 EA 5175.00 55,075.00 5145.00 s4,205.00 5200.00 55,800.00 =200.00 55,800.00 5125.00 i3,625.00
<br /> 21 6 Inch Grip Ring Accessory Kil 8 EA 5700.00 5600.00 590.00 5540.00 5100.00 5600.00 5150.00 5900.00 565.00 5390.00
<br /> 22 Remove Euisdng 121nch CMP&InsWll New 721nch CMP 700 LF 530.00 53,000.00 578.00 51.800.00 524.00 52,400.00 535.00 53,500.00 S3B.00 53,800.00
<br /> 23 Remove 8 Teinstall Existing Hydrant 2 EA t500.00 =1,000.00 5700.00 E1.400.00 E800.00 51.800.00 E1.500.00 53,000.00 57.200.00 52,400.00
<br /> 24 Sawcut 8 Remove Asphalt Pavemenl 120 SY 513.00 =1,560.00 513.50 51.620.00 530.00 §3,800.00 s40.00 t4,800.00 538.00 s4,580.00
<br /> 25 Bltuminlous Concrete Asphalt,CWss 1,(Variable Depth) 20 TON 5220.00 t4,400.00 =175.00 53,500.00 5175.00 E3,500.00 5180.00 =3,600.00 t220.00 54,400.00
<br /> 26 Tree Removal 1 LS 559,000.00 558,000.00 515,745.00 515,745.00 518,500.00 518.500.00 578,500.00 578,500.00 518.400.00 578,400.00
<br /> 27 InsWll New Service Connection 10 EA 5600.00 56,000.00 51,530.00 515,300.00 51,375.00 513,750.00 5200.00 SZ,000.00 5960.00 59,600.00
<br /> 28 Exploration Excavatlon 60 CY 56.00 5360.00 519.00 51,140.00 535.00 52.�00.00 550.00 =3,000.00 530.00 51.800.00
<br /> TOTAL BID As Corrected j164,567.50 5739,950.00 E145,420.00 E148,705.00 5198,040.00
<br /> -14.86•/. -11.64•/. -9.64X 20.34•/.
<br /> Percent Over or Under ENGINEER'S ESTIMATE
<br /> �`---�'/�� -�'�- �'-v�3
<br /> Matthew C.Newell,P.E.,City Engineer Date