My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-129 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-129 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 8:27:59 AM
Creation date
1/13/2016 8:27:58 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-129
Res Ord Title
AUTHORIZING AGREEMENT WITH ILLINOIS STATE WATER SURVEY FOR LAKE DECATUR WATERSHED MONITORING AGREEMENT
Approved Date
9/2/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Process and analyze annual data collection. The one-yeaz of data will be <br /> processed for water discharge (flow), nitrate and sediment concentrations, and nitrate and ' <br /> sediment loading for the watershed monitoring stations indicated in Table l. The entire study <br /> period dataset will be appended and analyzed to determine trends in flow and nitrates over time. <br /> 4. Prepare a final report. The final report will include summazies of the data <br /> collection for the year and comparative analysis of the da.ta from other years. The report shall <br /> contain discussions of the results of precipitation records, stream flow, nitrate and sediment <br /> concentrations, and nitrate and-sediment loading for the stations listed in table 1 during the study <br /> period. The report will also include an appendix containing the results of the azsenic and pH data <br /> collectia�. <br /> DELIVERABLES <br /> The main product to be delivered to the city will be the final report that summarizes the <br /> results of the study. A draft of this report (10 copies) will be delivered to the City of Decatur for <br /> their review 20 weeks after the end of the one-year data collection period, with the final report <br /> (approximately 25 copies)to be delivered 16 weeks later. <br /> Table 1. Monitoring Stations and Sampling Frequency in the Lake Decatur Watershed. <br /> William <br /> �ong Friends Lost Rt 36 Street Reas <br /> Creek Creek Bridge Bridge Bridge Bridge Monticello <br /> Analyte` (I01) (102) (107) (108) (109) (I10) (11�) <br /> Nitrate-N W, S W, S -- -- -- -- W, S <br /> Sediment W, S -- -- -- -- -- -- <br /> Arsenic -- -- B B B B B <br /> pH B B B B B B B <br /> W =Weekly sampling - <br /> S = Sample 5-7 storms per year <br /> B =Bi-weekly sampling <br /> �All samples will be collected and analyzed according to Standard Operating Procedures as set by the Illinois State <br /> Water Survey. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.