Laserfiche WebLink
C H R I S T Y • F O L T Z • I N C • B U I L D E R S <br /> 7 4 0 S O U T H M A i N S T R E E T • D E C A T U R • I L L I N O I S • 6 2 5 2 5 <br /> P. O. B O X 8 2 8 A R E A C O D E 2 1 7 • 4 2 8 - 8 6 0 1 <br /> � Ili <br /> Apnl 29, 200� <br /> Mr. Rob Shirley <br /> City of Decatur <br /> South Water Treatment Plant <br /> 1155 S. Martin Luther King, Jr. Drive <br /> Decatur, IL 62521 <br /> RE: Remodel and Addition <br /> Change Order#5 <br /> Gentlemen: <br /> At the instruction of the City of Decatur, we will repair the structural steel canopy <br /> framing on a time and material basis. We are in receipt of the suggested method of repair <br />� from Black and Veatch dated Apri124, 2003 and are intentions are to follow those <br /> recommendations. The cost of those changes will not exceed $5,000.00. <br /> Our price breakdown is as follows: <br /> Labor for two men,three days $2,285.00 <br /> Materials 100.00 <br /> Equipment 566.00 <br /> Overhead and Profit 515.00 <br /> Total Budget Estimate 3,466.00 <br /> If there are any questions, please feel free to contact us. <br /> Respectfully Submitted, <br /> Christy-Foltz, Inc. <br /> Larry Bafford <br /> � Copy: Mr. Steve Baumann, Chastain and Assoc. <br /> ----- _ ;___,. _ +: <br /> � <br /> ,�.��Y ., � ; <br /> ,,��E�E�, � �O�a <br /> �'A C� ` --- i;:�%e�, _ J , 4; <br /> •al,NEp`� ' .',.. � <br /> ; <br />