Laserfiche WebLink
' ' �•NYatthew C.Newell, P.E. <br /> City Engineer <br /> July 9, 2003 <br /> Page 2 of 2 <br /> Currently,the contract ma�mum has been exceeded by$1,591.38. <br /> In consideration of all of the above factors, we request that the contract limit for the Ridgeway Drive—Bayshore <br /> Drive Sanitary Sewer Study be increa,sed from$30,000 to$38,000. <br /> Very truly yours, <br /> Bainbridge, Gee, Milanski&Associates, Inc. <br /> � <br /> Charles R. Hunsi , <br /> c�v� <br /> C:\WORK\02-0741Newe1lLtr07.09.03.doc <br /> ��� i <br /> Paul Osborne, Mayor <br /> Attest: <br /> � �-- <br /> ( � <br /> �C�/I;�(.�_ ! _ � D.'I��C� <br /> Celeste F. Harris, City Clerk <br />