Laserfiche WebLink
,. •- - <br /> C H R I S T Y • F O L T Z • I N C • B U I L D E R S ' <br /> 7 4 0 5 O U T H M A I N S T R E E T • D E C A T U R • I L l I N O I S • 6 2 5 2 5 I <br /> P. O. B O X B 2 8 A R E A C O D E 2 1 7 • 4 2 8 - 8 6 0 1 II <br /> �`� <br /> January 13, 2003 � � <br /> �� <br /> Mr. Rob Shirley � �� � ,01� <br /> Crty of Decatur � �(� <br /> South Water Treatment Plant � � ' <br /> 1155 South Martin Luther King, Jr. Drive <br /> Decatur, IL 62521 <br /> RE: Change Order#4 <br /> Quote for additional work <br /> Gentlemen: <br /> After our investigation of the wall opening thickness for 001 and 002, we discovered that <br /> opening 002 has a thickness of 26", but 001 has a thickness of 38". Do to the additional <br /> thickness of concrete at opening 001, we propose an add of$2,916.00 for additional labor <br /> and equipment to remove the approximately 47 cubic feet of material from the wall. <br /> If there are any questions, please feel free to contact us. <br /> Respectfully Submitted, <br /> Christy-Foltz, Inc. <br /> Larry Bafford <br /> � Copy: Mr. Steve Baumann, Chastain and Assoc. <br /> �� '. <br /> ,.s`'`"`�,<< �-:�� � __ <br /> .�A C� -� _ _ <br /> ���Ep`'M _..._. <br />