1 <br /> . , <br /> • CHANGE ORDER <br /> Order No. 1 <br /> Date: 12/18/2002 <br /> Agreement Date: 11/01/2002 � <br /> NAME OF PROJECT: SWTP Expansion of Lab and Office Area <br /> City Project No. 2000-31 <br /> OWNER: City of Decatur, Illinois <br /> CONTRACTOR: Christy-Foltz, Inc. <br /> The following changes are hereby made to the CONTRACT DOCUMENTS: Remove layer of existir�g <br /> concrete encasement above existing 54"flood drain to allow placement of the proposed floor slab to the <br /> design thickness. <br /> Justification: The Contract Documents did not indicate an existing concrete encasement to be removed. <br /> Per the structural engineer, the slab and reinforcement design required the upper portion of the concrete <br /> encasement to be removed. The attached invoice was provided by Christy-Foltz. The cost included <br /> appears reasonable and justified. <br /> Change to CONTRACT PRICE: <br /> • Original CONTRACT PRICE: $1,626,195.00 <br /> Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $1,626,195.00 <br /> The CONTRACT PRICE due to this CHANGE ORDER will be increased by: $1,644.62 <br /> The new CONTRACT PRICE including this CHANGE ORDER will be: $1,627,839.62 <br /> Change to CONTRACT TIME: <br /> The CONTRACT TIME will be (increased) by: 0 calendar days <br /> The date for completion of all work will be: <br /> Substantial Completion: 06/17/2003 <br /> Final Completion: 07/17/2003 <br /> � �Z- 2 - 02. <br /> Requested by: � <br /> C is Foltz,Inc. Date <br /> Recommended by: �.Q.�.,,..,�� � /�„�,�,��b. I/ 7 / O 3 <br /> ��&Veatc�Corporation Date <br /> Ordered and Accepted by: I�vl� ��1�,v��•�el� ��)J 'U J <br /> City of Decatur, Illinois Date <br /> • <br />