Laserfiche WebLink
2.2 Bodine will install one boring to an approximate depth of 10 fbgs to encounter the <br /> backfill material. <br /> 23 Bodine shall utilize hand or mechanical augers to obtain a soil sample from <br /> approximately 10 fbgs. Since there are no Illinois EPA sampling protocols for this type <br /> of investigation under standard regulatory programs, Bodine proposes the installation of <br /> one boring at the approximate location of the lowest elevation of the sanitary sewer <br /> discharge near North Water Street from building diagrams. For this boring, one soil <br /> sample will be obtained from the approximate base of the fill material used around the <br /> piping and submitted for laboratory analysis of Volatile Organic Compounds(VOCs), <br /> Semi-Volatile Organic Compounds (SVOCs) and the eight (8)Resource Conservation <br /> and Recovery Act(RCRA)Metals. The boring shall be screened with a PID to determine i <br /> the appropriate interval to collect samples for laboratory analysis. <br /> 2.4 The vertical sample location shall be determined in the field using the PID and auger <br /> cuttings. The location within the boring that exhibits the highest PID reading shall be <br /> collected for analysis. If PID readings do not indicate the presence of VOCs, a grab !i <br /> sample shall be collected at an interval consistent with the highest potential for the <br /> presence of contamination. <br /> 2.5 Bodine shall submit up to 1 sample for laboratory analysis of VOCs, SVOCs and 8 <br /> RCRA Metals. <br /> 2.6 Bodine shall submit the soil samples to and Illinois EPA Certified Laboratory for analysis <br /> of VOCs using method SW 846 Method 5035/8260 and SVOCs using method SW 846 <br /> Method 8270/8310 and 8 RCRA Metals using method SW 846 6020. <br /> 2.7 Upon completion of the subsurface investigation, the boring location shall be filled with <br /> excess drill cuttings. The remaining drill cuttings will be spread immediately adjacent to <br /> the boring. <br /> 3.0 LETTER REPORT <br /> 3.1 Following the completion of the investigation and upon receipt of the analytical results, <br /> Bodine shall prepare a Letter Report which outlines the findings of the subsurface <br /> investigation. Analytical results will be compared to applicable State regulatory levels, as <br /> specified in the applicable regulations. Included with the report will be a site diagram, <br /> boring logs, analytical results table,photographs and copies of the analytical report from <br /> the laboratory. The report shall include written descriptions of activities performed. <br /> 4.0 COMPENSATION <br /> 4.1 The estimated cost to conduct the subsurface investigation in accordance with Article 1.0, <br /> 2.0 and 3.0 is $9,460.00: <br /> -3- <br /> BOD/NE ENVIRONMENTAL SERVICES, INC. <br />