My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-65 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-65 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 10:07:34 AM
Creation date
1/14/2016 10:07:32 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-65
Res Ord Title
AUTHORIZING AGREEMENT FOR TWIN BRIDGE ROAD FEASIBILITY STUDY
Approved Date
5/5/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' . HOMER L.CHASTAIN&ASSOCIATES,LLP <br /> Consulting Engineers <br /> DECATUR&CHICAGO,ILLINOIS <br /> AGREEMENT FOR PROFESSIONAL SERVICES <br /> TERMS AND CONDITIONS <br /> These Terms and Conditions are a part of the Agreement between the Client(Owner)and Homer L Chastain&Associates, LLP, (Engineer). Any , <br /> provision or part thereof of this agreement held to be void or unenforceable under any law shall be deemed stricken,and all remaining provisions shall <br /> continue to be valid and binding upon the parties. The parties agree that this agreement shall be reformed to replace such stricken provision or part <br /> thereof with a valid and enforceable provision which comes as close as possible to expressing the intention of the stricken provision. <br /> AMENDMENTS <br /> This agreement may be amended only in writing by both the Owner and Engineer. <br /> COMPENSATION FOR PROFESSIONAL SERVICES <br /> The basis for compensation will be either 1)a Lump-Sum Amount as noted on the face of this agreement or 2)payment for all hours worked on the <br /> project based on the indicated rate for the class of personnel shown�the current Schedule of Hourly Rates in effect plus reimbursable expenses. <br /> (See attached Person Hour and Direct Cost Estimate.) <br /> "Reimbursable Expenses" means the actual expenses incurred directly or indirectly in connection with the work including but not limited to the <br /> following: Transportation and subsistence,toll telephone calls,telegrams,reproduction w printing,computer time and outside consultants. <br /> TIME OF PAYMENT <br /> The Engineer may submit monthly statements for services and expenses based upon the proportion of the actual work completed at the tirne of <br /> billing. Unless provided for othenvise,payments for professional services will be due and payable upon the issuance of the Engineer's invoice. We <br /> bill for work done each month by the 10th of the foltowing month. <br /> LATE PAYMENT <br /> If the Owner fails to make any payment due the Engineer for services and expenses within the time period specified,a service charge of 1.5%per <br /> month may be added to the Owner's account at the Engineer's discretion. This is an annual rate of 18%_ Owner further agrees to pay all expenses of <br /> collection,including court costs and reasonable attorney fees should it become necessary to refer Owner's account tor collection. <br /> LIMITATION OF LIABILITY <br /> The Engineer and Owner agree to defend, indemnify, and hold harmless each other,from and against legal liability for all claims, Iosses, damages, <br /> and expenses resulting from death or bodily injury to person, damage or destruction to third-party property to the extent such claims, losses, <br /> damages,or expenses are caused by the joint or concurrent negligence of the Engineer and Owner,they shall be bome by each party in proportion to <br /> its own negligence. <br /> TERMINATION <br /> This agreement may be terminated by either party within three days after receiving written notice. Any termination shall only be for good cause such <br /> as for legal, unavailability of adequate financing or major changes in the work. In the event of any termination, the Engineer will be paid for all <br /> services and expenses rendered to the date of termination on a basis of the Schedule of Rates plus reimbursable expenses and reasonable <br /> termination costs. <br /> DELIVERABLES AND ELECTRONIC FILES <br /> Plans, specifications,and electronic files are instruments of service and remain the property of the Engineer. Sealed hardcopy mylar plans provided <br /> by the Engineer are actual deliverables and have precedence over any electronic files supplied to the Owner as a convenience. Electronic files are <br /> supplied in the software format currently in use by the Engineer,who has no contrd over deterioration or functional obsolescence due to upgraded <br /> versions of software programs. Owner agrees to indemnify and hold Engineer harmless from claims resulting from unauthorized reuse of electronic <br /> files or unauthorized changes made by Owner or others to files in the Owner's possession. Information contained in electronic files is valid only for 60 <br /> days following delivery to the Owner,and the Engineer is not responsible for data deterioration within the file. <br /> REUSE OF DOCUMENTS <br /> All documents including drawings and specifications furnished by Engineer pursuant to this Agreement are instruments of his services in respect of <br /> the work. They are not intended or represented to be suitable for reuse by Owner or others on extensions of this work,or on any other work. <br /> ESTIMATES OF COST <br /> Since the Engineer has no control over the cost of labor, materials or equipment or over a Contractor(s) methods of determining prices, or over <br /> competitive bidding or marketing conditions, his opinions of probable Project Cost or Construction Cost that may be provided for herein are to be <br /> made on the basis of his experience and qualifications and represent his best judgment as a design professional tamiliar with the construction <br /> industry, but Engineer cannot and dces not guarantee that proposals, bids or the construction cost will not vary from opinions of probable cost <br /> prepared by him. If the Owner wishes greater assurance as to the Construction Cost,he shall empby an independent cost estimator. <br /> 2 of 6 <br /> I:\Municipalities\City_of Decatur\4819_Twin_Bridge_Rd\Management\Twin Bridge Rd Study Contract 03-04-2003.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.