Laserfiche WebLink
� Request for Approval of Change in Plans—City Project 2003-24 <br /> Page 2 of 3 <br /> • Catch Basin/Manhole Milling: $614.20 addition � <br /> Additional structures in Alley 6 required additional milling. <br /> • Combination Curb & Gutter Removal and Replacement: $4,182.75 deduction <br /> First Drive was omitted from contract due to delay in resolving IEPA monitor well <br /> questions. <br /> • Steel End Section, 12-inch: $819.00 deduction <br /> Pershing Road culverts did not require replacement. <br /> • Pipe Culvert, Class D, Ty 1,24-inch: $1,512.00 deduction <br /> Taylor Avenue pipe culvert did not require replacement. <br /> • Storm Sewer, Class B,Ty 1, 12-inch: $3,407.80 deduction <br /> Storm sewer was performed by the City of Decatur Street Department prior to <br /> �, commencement of the project. <br /> • Inlet, Ty A Special,Ty 3 frame & Grate: $908.25 deduction <br /> Number of inlets repaired on Kaydon Drive were reduced. <br /> • Manhole Adjustment: $16,401.00 deduction <br /> Manhole condition required replacement instead of adjustment. <br /> • Manhole Concrete Flat Top; $819.00 deduction <br /> Manhole condition required replacement instead of adjustment with flat top section. <br /> • Manhole Ty A,4-ft. diameter, Ty 1 F/G CL lid: $26,932.50 <br /> Additional depth of earth excavation required for Belmont Avenue, Stone Street and <br /> Wayside Drive to reach the project's profile resulted in the manholes to be rebuilt and <br /> replaced. , <br /> • Valve Box Adjustments: $2,037.00 addition <br /> Changes in the design limits caused addition to quantities. <br /> • Valve Box Frame & Lid: $1517.25 addition <br /> Changes in the design limits caused addition to quantities. <br /> • Combination Concrete Curb & Gutter, Ty B6-18: $10,063.68 deduction <br /> The North side of McKinley Avenue (Main to Water) was not replaced due to the <br /> condition of the curb & gutter after the asphalt overlay was removed. <br />