Laserfiche WebLink
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2003-18 <br /> April 22, 2003 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E., Director of Engineering & Infrastructure j� <br /> Matthew C. Newell,P.E., City Engineer�� <br /> SUBJECT: Street Reconstruction, City Project 2003-24 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Street Reconstruction, City Project 2003-24, to Dunn Company, as the lowest, <br /> responsible bidder in the amount of$1,332,924.69, and that the Mayor be authorized to execute <br /> the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> The Street Reconstruction Program provides a new subgrade and pavement surface in curbed or <br /> non-curbed streets or alleys having an existing asphalt pavement with no remaining useful life or <br /> that suffer a significant loss of structural capacity. Streets proposed for this project have existing <br /> pavement that is badly deteriorated through age and use. These pavements can no longer be <br /> effectively maintained by the City's street crews. An additional goal of the project is to restore <br /> any existing curb and gutter to full function wherever possible. <br /> Street reconstruction work involves the removal of the existing street, the construction of a <br /> stabilized base course and the placement of an asphalt surface. This work is generally completed <br /> over the course of one week. A listing of the streets included in this year's reconstruction project <br /> is attached for your information. <br /> The project specifications were prepared by the Engineering Division. The project was <br /> advertised on April 9, 2003 and bids were received on Apri122, 2003. The results of the letting <br /> are as follows (bid tabulation attached): <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over (-Under� <br /> Engineer's Estimate $1,769,682.00 ----- <br /> Dunn Company $1,332,924.69 (-24.68%) <br />