My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-41 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-41 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 10:46:11 AM
Creation date
1/14/2016 10:46:11 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-41
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT MISCELLANEOUS SANITARY SEWER REHABILITATION
Approved Date
4/7/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2003-13 <br /> March 27 2003 <br /> TO: Honorable Mayor Howley and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E., Director of Engineering & Infrastructur��R�" <br /> Matthew C. Newell, P.E., City Engineer� <br /> SUBJECT: Miscellaneous Sanitary Sewer Rehabilitation, City Project 2003-14 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Miscellaneous Sanitary Sewer Rehabilitation, City Project 2003-14, to Insituform <br /> Technologies USA, Inc., as the lowest, responsible bidder in the amount of$393,649.00, and that <br /> the Mayor be authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> The Miscellaneous Sanitary Sewer Rehabilitation project entails the structural lining of sewer <br /> pipes that are in poor structural condition. Pipe lining is accomplished by using water pressure to <br /> insert a resin coated felt tube, somewhat like a long balloon, that is unfolded into the line and <br /> then cured by heating the water in the line to harden the resin. The ends are then cut and service <br /> laterals are reestablished. Interested Council members can find out more information on this <br /> rehabilitation process by visiting the Insituform web site (www.insituform.com) or one of the <br /> other web sites set up by contractors that provide this type of service. <br /> Over the past several years the City has been pursuing an aggressive sanitary sewer inspection <br /> program which has identified numerous lines that are in relatively poor structural shape. <br /> Additionally, some sanitary sewer lines have deteriorated joints that allow an inordinate amount <br /> of ground water to infiltrate into the pipe thus causing backups and surcharges during wet <br /> weather. Cured-in-place sewer lining adds structural capacity to pipes that are cracked and in the <br /> process of failing and it closes up leaking joints that are allowing ground water to enter the pipe. <br /> This type of repair method can be significantly cheaper than digging up a collapsed line and it is <br /> important that pipe line inspection continue to identify candidate lines and that funding continue <br /> to be available to restore them before the damage increases. <br />
The URL can be used to link to this page
Your browser does not support the video tag.