My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-23 AUTHORIZING AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-23 AUTHORIZING AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:23:10 AM
Creation date
1/14/2016 11:23:08 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-23
Res Ord Title
AUTHORIZING AN AGREEMENT FOR A CAPITAL ASSISTANCE GRANT - ILLINOIS DEPARTMENT OF TRANSPORTATION
Approved Date
2/17/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> DECATUR PUBLIC TRANSIT SYSTEM <br /> GRANT CONTRACT FOR IDOT MATCHING FUNDS <br /> IDOT GRANT #CAP-03-851-FED <br /> FTA GRANT #IL-90-X432-00 <br /> PROJECT DESCRIPTION AND JUSTIFICATION <br /> 11.42.06 Acquire Shop Equipment ($ 3�,000): purchase and install in-ground bus lift. <br /> Proposed for purchase is one in-ground bus lift to be used with the nevv style <br /> "low-floor" buses that the City acquired in 2001. While the bus lift can be used <br /> for any style of bus, the bus lift is required for the low-floor buses because of their <br /> lower ground clearance. The standard floor jacks will not work on the low-floor <br /> buses. Installing the bus lift will allow the maintenance department to do mo�e <br /> types of repairs than they are now able to do, and will eliminate the need to tow <br /> buses to an outside shop for repairs. <br /> 11.44.02 Rehab/Renovate Maintenance Facility($ 70,000): replace all bus barn overhead <br /> doors and motors. <br /> The bus barn is over 20 years old, and the overhead doors and motors need to be <br /> replaced. The City paid over $8,000 in FY-01 and FY-02 for service and repairs <br /> to these doors. We have been advised that the doors and motors are in urgent <br /> need of replacement, and that the annual cost of repairs will likely go up <br /> significantly as the doors get older. <br /> PROJECT FUNDING <br /> Project Source of Funds <br /> Description Total Cost FTA State Citv <br /> Replace Bus Barn Doors $70,000 $�6.000 $14,000 $ 0 <br /> and Motors <br /> In-Ground Bus Lift $3�,000 $28,000 $ 7,000 $ 0 <br /> TOTAL: $105,000 $84,000 $21,000 $ 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.