My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-14 AUTHORIZING FILING
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-14 AUTHORIZING FILING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:43:29 AM
Creation date
1/14/2016 11:43:26 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-14
Res Ord Title
AUTHORIZING FILING WITH THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY - NOTICE OF INTENT
Approved Date
2/3/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� SBMP No. D.5 <br /> Brief Description of BMP: Prepare and implement procedures for respondin�to information submitted <br /> bv the public in regard to erosion and sediment control. <br /> Measurable Goal(s), including frequencies: Over a 5 vear period, Urepare and impelemt procedures for <br /> responding to information submitted by the public in regard to erosion and sediment control. <br /> i n • Year 1: Review existin Ci re ulations and re are chan es to com 1 with NPDES <br /> M lesto es. � ty g U U g U Y <br /> Permit No. ILR40. <br /> Year 2: AUprove proposed sediment and erosion control regulatory changes. Prepare <br /> procedures for respondin� to information received from the public in re�ard to erosion and sediment <br /> control. <br /> Year 3: Im lement rocedures for res ondin to information received from the ublic in <br /> regard to erosion and sediment control. <br /> Year 4: Continue with information handling procedures. Make changes to the urocedures <br /> as necessary. <br /> Year 5: Continue with information handlin� procedures. Make changes to the procedures <br /> as necessarv. <br /> BMP No. D_6 <br /> Brief Description of BMP: Prepare and implement site inspection/enforcement procedures to require <br /> sediment and erosion control svstems. <br /> Measurable Goal(s), including frequencies: Over a 5 vear period, prepare and implement site inspection / <br /> enforcement procedures to require sediment and erosion control systems. <br /> Milestones: Year 1: Review existing Citv re�ulations and prepare changes to comply with NPDES <br /> Permit No. ILR40. <br /> Year 2: Approve proqosed sediment and erosion control regulatory changes. Prepare site <br /> inspection/enforcement procedures that will implement City regulations. <br /> Year 3: Imqlement site inspection/enforcement procedures in accordance with City <br /> regulations. <br /> Year 4: Continue with site inspection/ enforcement procedures. Make changes as <br /> necessary. <br /> Year 5: Continue with site inspection/ enforcement procedures. Make changes as <br /> necessarv. <br /> Information required by this form must be provided to comply with 415 ILCS 5/39(2000). Failure to do so may prevent this form from being processed and could <br /> result in your application being denied. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.