Laserfiche WebLink
e ' ' <br /> � 3BMP l�o. E.6 <br /> Brief Description of BMP: Provide post-construction site inspections to assure compliance with City <br /> regulations. <br /> Measurable Goal(s), including frequencies: Over a five vear period, complete post-construction site <br /> inspections prior to releasing site bonds to assure that sites are constructed in accordance with the <br /> approved site plan and in accordance with City regulations. <br /> Milestones: Year 1: Complete post-construction site inspections prior to site bond release to assure <br /> compliance with Citv standards and auproved site plans. <br /> Year 2: Complete post-construction site inspections Urior to site bond release to assure <br /> compliance with Citv standards and approved site plans. <br /> Year 3: Complete Uost-construction site inspections prior to site bond release to assure <br /> compliance with Citv standards and apnroved site plans. <br /> Year 4: Complete post-construction site inspections prior to site bond release to assure <br /> compliance with Citv standards and approved site plans. <br /> Year 5: Complete post-construction site inspections prior to site bond release to assure <br /> com liance with Ci standards and a roved site lans. <br /> BMP No. F.1 <br /> Brief Description of BMP: Implement a nollution prevention trainin�program for City maintenance and <br /> engineering staff. <br /> Measurable Goal(s), including frequencies: Over a five vear period, develop and provide trainin� on a <br /> Yearlv basis on storm water pollution control to Citv maintenance and engineering staff. <br /> Milestones: Year 1: Develop training on storm water pollution control geared toward City <br /> maintenance and engineering staff. <br /> Year 2: Provide training on storm water pollution control for City maintenance and <br /> en�ineering staff. <br /> Year 3: Provide training on storm water pollution control for City maintenance and <br /> engineering staff. <br /> Year 4: Provide training on storm water pollution control for City maintenance and <br /> en�ineering staff. <br /> Year 5: Provide training on storm water pollution control for City maintenance and <br />� engineering staff. <br /> Information required by this form must be provided to comply with 415 ILCS 5/39(2000). Failure to do so may prevent this form from bemg processed and could <br /> result in your application being denied. <br /> Page 14 <br />