Laserfiche WebLink
3 � ' <br /> � � i �� <br /> Part II. Best Management Practices (include shared responsibilities) Proposed to be <br /> Implemented in the MS4 Area <br /> (Details of BMP implementation for each checked BMP number, e.g.,A.1, E.2, is required in Part IV of <br /> this NOI.) <br /> A. Public Education and Outreach D. Construction Site Runoff Control <br /> � A.1 Distributed Paper Material � D.1 Regulatory Control Program <br /> ❑ A.2 Speaking Engagement ❑ D.2 Erosion and Sediment Control BMPs <br /> � A.3 Public Service Announcement ❑ D.3 Other Waste Control Program <br /> ❑ A.4 Community Event � D.4 Site Plan Review Procedures <br /> � A.5 Classroom Education Material � D.5 Public Information Handling Procedures <br /> ❑ A.6 Other Public Education � D.6 Site Inspection/Enforcement Procedures <br /> ❑ D.7 Other Construction Site Runoff Controls <br /> B. Public Participation/Involvement <br /> ❑ B.1 Public Panel E. Post-Construction Runoff Control <br /> ❑ B.2 Educational Volunteer ❑ E.1 Community Control Strategy <br /> ❑ B.3 Stakeholder Meeting � E.2 Regulatory Control Program <br /> � B.4 Public Hearing � E.3 Long Term O&M Procedures <br /> ❑ B.5 Volunteer Monitoring ❑ E.4 Pre-Const Review of BMP Designs <br /> ❑ B.6 Program Coordination ❑ E.5 Site Inspections During Construction <br /> ❑ B.7 Other Public Involvement � E.6 Post-Construction Inspections <br /> ❑ E.7 Other Post-Const Runoff Controls <br /> C. Illicit Discharge Detection and Elimination <br /> � C.1 Storm Sewer Map Preparation F. Pollution Prevention/Good Housekeeping <br /> � C.2 Regulatory Control Program � F.1 Employee Training Program <br /> � C.3 Detection/Elimination Prioritization Plan � F.2 Inspection and Maintenance Program <br /> � C.4 Illicit Discharge Tracing Procedures ❑ F.3 Muni Operations Storm Water Control <br /> � C.5 Illicit Source Removal Procedures ❑ F.4 Municipal Operations Waste Disposal <br /> � C.6 Program Evaluation and Assessment ❑ F.5 Flood Management/Assess Guidelines <br /> � C.7 Visual Dry Weather Screening � F.6 Other Municipal Operations Controls <br /> ❑ C.8 Pollutant Field Testing <br /> � C.9 Public Notification <br /> ❑ C.10 Other Illicit Discharge Controls <br /> Information required by this form must be provided to comply with 415 ILCS 5/39(2000). Failure to do so may prevent this form from being processed and could <br /> result in your application being denied. <br /> Page 2 <br />