Laserfiche WebLink
6. The City will assume, at it's expense, all cost to repair or replace all parts and <br /> components normally consumed in day-to-day operations such as: tires, tubes, tire repairs, <br /> lubricating oil, filters of all types, grease, fuel, anti-freeze, cutting edges, batteries, headlights, <br /> glass breakage, wire rope, belts, brake linings, cleaning, painting, jet rodder hose, suction hose <br /> and pipe, valves, electrical parts, clamps, gaskets, nozzles and repair fittings. <br /> 7. Coe shall have a parts availability policy to supply the City with new parts within I <br /> 48 hours (excluding Saturday, Sunday and holidays) or will furnish the parts upon request at no I <br /> cost. Parts covered in this guarantee are those new parts required for normal repairs and <br /> maintenance necessary to keep the machine operating in a day-to-day operation. <br /> 8. The City will maintain equipment in accordance with normal published <br /> manufacturer's recommendations. <br /> 9. Coe has the right to inspect equipment during normal working hours at the City <br /> and make recommendations for repairs, improved maintenance, etc., in keeping with the <br /> requirements stated by the manufacturer in the shop manual for the maintenance and repair of the <br /> piece of equipment. <br /> 10. Coe will be fully responsible for the total cost of all repairs (other than in <br /> Paragraph 6) to the equipment on the following Power Train items, in excess of the guaranteed <br /> maximum cost of repairs (as indicated on Exhibit A) for the time of operation in hours, or period <br /> of time in years, from the date of delivery, whichever occurs first (as indicated on Exhibit A). <br /> ,„� .� <br /> � , , , , , � <br /> t <br /> h? " <br /> , , , , � ? <br /> � <br /> , , , /`I ;� <br />