Laserfiche WebLink
- -ti <br /> . ' ' I <br /> Page 2 <br /> Traffic signal interconnect work is proposed to link the signalized intersections on Rt. 36 from <br /> West Eldorado Street to Martin Luther King, Jr., Drive, on 22nd Street from Eldorado Street to <br /> Rt. 36, and on Rt.36 from 22nd Street to Wood Street. An interconnect between the traffic <br /> signals will enable the signal systems to communicate with each other and allow City staff to <br /> remotely monitor and modify the operation of the traffic signals. <br /> POTENTIAL OBJECTION: There are no known objections. , <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation , <br /> STAFF REFERENCE: Matt Newell, City Engineer at 424-2747 �' <br /> The City Engineer, Matt Newell, will be in attendance at the City Council meeting to answer any il <br /> questions of the Council on this item. I <br /> BUDGET/TIME IMPLICATIONS: <br /> The City's resolution allocates a maximum cost of $60,270, or 125% of the estimated <br />, construction and engineering costs. These costs are proposed to be paid with Motor Fuel Tax <br /> Funds. <br /> attach: 2 <br /> cc: John Smith, Assistant City Manager of Public Services <br />