My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-193 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-193 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 2:19:54 PM
Creation date
1/14/2016 2:19:53 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-193
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH SKS ENGINEERS, INC., FOR DESIGN SERVICES COUNTRY MANOR / POWERS BOULEVARD AREA STREET IMPROVEMENTS
Approved Date
10/21/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f' . <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br />� NO. 2002-71 <br /> I <br />� October 10, 2002 <br /> TO: Honorable Mayor Howley and City Council <br />� FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E., Director of Engineering & Infrastructu�� <br /> Matthew C. Newell, P.E., City Engineer�,�t,�vi <br /> SUBJECT: Country Manor/Powers Boulevard Area Street Improvements <br /> City Project 2001-07 <br /> SUMMARY RECOMMENDATION: <br /> It is proposed that the City Council authorize an agreement for engineering services with SKS <br /> Engineers, Inc., (SKS) for a fee not to exceed $24,780 to provide design services for a proposed <br /> street improvement project for the Country Manor/Powers Boulevard area. <br /> BACKGROUND: <br /> Over the past several years, City Engineering has received numerous complaints from Country <br /> Manor Drive / Powers Boulevard area residents regarding the condition of the streets servicing <br /> the neighborhood. Roadway damage to the concrete pavement in this area is significant enough <br /> that traditional pavement rehabilitation techniques can no longer adequately address the needed <br /> repairs. <br /> In April 2001, the City Council authorized a preliminary design services contract with SKS to <br /> evaluate the neighborhood street system and propose an improvement method. The report <br /> recommended that significant portions of Powers Boulevard and Country Manar Drive be <br /> replaced with new pavement over an improved subgrade. Recommendation was also made to <br /> provide storm drainage improvements and other less extensive pavement repairs. <br /> SKS has a significant knowledge of pavement design and staff recommends that they be awarded <br /> the final phase of the Country Manor/ Powers Boulevard area street improvement design work. <br /> This work will encompass the overall project design which includes the development of plans, <br /> the preparation of specifications and the computation of the engineer's estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.