My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-174 AUTHORIZING THE EXECUTION OF PROFESSIONAL SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-174 AUTHORIZING THE EXECUTION OF PROFESSIONAL SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:16:37 PM
Creation date
1/14/2016 3:16:36 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-174
Res Ord Title
AUTHORIZING THE EXECUTION OF PROFESSIONAL SERVICES AGREEMENT SWTP OFFICE AND LAB EXPANSION
Approved Date
9/16/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Person Flour&Cost Submittal <br /> Client: City of Decatur Person Hour Cost Estimate Date: 19-Au 02 <br /> HLC Project No. 4775 9- Direct Cost Estimate <br /> 135.20 78.00 48.23 79.95 42.25 38.22 41.34 47.32 37.70 <br /> Project Location: SWTP Office 8�Lab Expansion : Project Completion Date July 17,2003 Foltz Baumann Wilson Wavering Anderson Walker Miller Troxel Raney $18.00 $40.00 $0.10 $250 $2.00 <br /> Partner Project Project Party Rod Hour Day Each Day Each <br /> Item No. Item Descriotion In charqe Manaqer Enqineer PLS Chief Person QA/QC Acctn . Clerical CADD Vehicle Xerox GPS Prints <br /> 1 HLC In-House Proiect Manaqement and Administration <br /> 1.1 Project Set Up: Computer&hard copy files,budget and schedule 2 4 4 40 <br /> 1.2 Project Progress and Closeout: maintain files&monitor HLC budget 6 12 40 <br /> 1.3 Project Invoicing of City of Decatur(12 months) 6 12 12 40 <br /> Person Hours 58 14 16 0 0 0 0 0 16 12 0 0 120 0 0 <br /> Personnel Cost $4,350.32 $1,892.80 $1,248.00 $0.00 $0.00 $0.00 $0.00 $0.00 $757.12 $452.40 $0 $0 $12 $0 $0 <br /> 2 Site Observation and Liaison with Owner and Contractor <br /> Line Item Total $12 <br /> 2.1 Conduct on-site observations of the work in accordance with contract documents 230 92 115 <br /> 2.2 Work out field details with Contractor and coordinate response to Contractot with Owner and Black&Veatch(B&� g2 <br /> 2.3 Coordinate with Contractor&Owner to minimize disruption to ongoing Owner activities �2 <br /> 2.4 Obtain additional information from Owner required to complete the work 12 <br /> 2.5 Report to Owner and 88�V regarding deficiencies in Contractor's work �2 <br /> 2.6 Monitor differing site conditions and site related utilities 40 <br /> 2.7 Review Contractor's Construction sequence and progress and report to Owner 24 <br /> 2.8 Verify utilities have been notified of construction schedule 4 <br /> 2.9 Establish and furnish baselines and controi points(staking by Contractor) 20 10 30 30 <br /> 2.10 Verify materials conform to construction contract documents and reviewed submittals by B&V �z <br /> 2.11 Coordinate on-site materials testing service and report to Contractor 8�Owner 46 <br /> 2.12 Observe field testing of equipment,structures,piping and forward to Black&Veatch 20 <br /> Person Hours 686 0 524 92 10 30 30 0 0 0 0 115 0 0 0 <br /> Personnel Cost $48,522.76 $0.00 $40.872.00 $4,437.16 $799.50 $1,267.50 $1,146.60 $0.00 $0.0� $0.00 $0 $4,600 $0 $0 $0 <br /> Line Item Total $4,600 <br /> 3 MeetinQs. Re�orts and Document Review and Maintenance <br /> 3.1 Attend precon conference and assist Owner in explaining project administrative procedures 4 4 <br /> 3.2 Attend progress meetings as necessary to coordinate the work 46 12 <br /> 3.3 Submit weekly progress report to Owner and B&V 46 <br /> 3.4 Review progress of work,submittals, reviews,and payments for acceptability 92 <br /> 3.5 Report to Owner and B&V work known to be defective prior to final payment 24 <br /> 3.6 Review progress payments and comment to Owner on acceptability 24 <br /> 3.7 Report date of receipt of shop drawings and samples furnished at the site 12 <br /> 3.8 Verify O&M manuals are being prepared and coordinate preliminary review with B&V 12 <br /> 3.9 Maintain marked up set of drawings and specifications based on data provided by Contractor 92 <br /> 3.10 Maintain critical documents at the jobsite for review by Owner and B&V 46 <br /> 3.11 Maintain a daily log of events at the jobsite 115 <br /> Person Hours 529 0 513 16 0 0 0 0 0 0 0 0 0 0 0 <br /> Personnel Cost $40,785.68 $0.00 $40,014.00 $771.68 $0.00 $0.00 $0.00 $0.00 $O.OQ $0.00 $0 $0 $0 $0 $0 <br /> 4 Assist in Certification of Substantial Comofetion <br /> Line Item Total $0 <br /> 4.1 Submit to Contractor list of items requiring completion or correction 30 <br /> 4.2 Assist Owner and B&V in conducting final inspection 10 <br /> 4.3 Verify all punch list items have been completed and corrected 20 <br /> 4.4 Project Closeout: Lien waivers,material inspection certificates,verify record drawings 20 20 <br /> Person Hours 100 0 80 20 0 0 0 0 0 0 0 0 0 0 0 0 ' <br /> Personnel Cost $7,204.60 $0.00 $6,740.00 $964.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 $0 $0 $0 $0 , <br /> Line Item Total $0 ' <br /> Total Project Personnel Costs $100,863 Total Project Hours 1,373 114 per month <br /> 2003 Rate Adjustment Factor $2,522 Total Cost per Hour $75.30 <br /> Total Project Direct Costs $4,612 <br /> Total Project Costs $107,997 <br /> Notes: Assume HLC staH receives 5%raise for the calendar year. <br /> Contract assumes the project will shut down for 6 weeks during winter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.