Sesom/Semor Drainage Improvments �Continued) Engineer's EsGmaM SicilWno,Inc. EnUer ExwvaUng Co.,Inc. Bodine Services,Inc.
<br /> City ProJect 200152 3650 Winchester Road 818 N.Sunnyside 5330 E.Firehouse Road
<br /> Ci En ineerin Dlvision S rin fleld IIIlnois 62707 Decatur IL 62522 Decatur IL 62521
<br /> ITEM PAY ITEM QUANTITY UNIT UNIT PRICE TOTAL UNR PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
<br /> NUMBER
<br /> ��� STORM SEWERS,TYPE 7,REINFORCED CONCRETE ELLIPTICAL �ZO FOOT Z140.00 516,800.00 E53.49 56,418.80 580.00 59,600.00 5124.00 574,880.00
<br /> PIPE,SPAN 38,RISE 24
<br /> 55060050 STORM SEWERS,CLASS B,TYPE 1,72" 55 FOOT S�•� 51,237.50 535.74 E1.865.70 521•00 51,155.00 Sz5.00 51,375.00
<br /> 55080090 STORM SEWERS,CLASS B,TYPE 1,18" 106 FOOT 530.00 53,180.00 531.06 E3,292.36 528.� 53,074.00 S�Z•�0 57,392.00
<br /> 55060120 STORM SEWERS,CLASS B,TYPE 1,24" 723 FOOT 532.00 523,736.00 S28•74 520,345.22 536.00 526,028.00 55�.00 536,150.00
<br /> 55100300 STORM SEWER REMOVAL 8" 100 FOOT 59.00 5900.00 511.18 5�,��9•00 510.00 51,000.00 515.00 51,500.00
<br /> 56108300 ADJUSTING WATER MAIN 8" 34 FOOT 5120.00 54,080.00 535.55 51,208.70 5105.00 53,570.00 5100.00 53,400.00
<br /> 56200200 WATER SERVICE LINE]/4" 20 FOOT SS0.00 5600.00 yt2.33 Sa46.60 519.00 5380.00 578•00 5360.00
<br /> 56300100 ADJUSTING SANITARY SEWERS,BaNCH DIAMETER OR LESS 30 FOOT 575.00 S�.O50.00 538.40 51,152.00 528.00 Z840.00 525.00 5750•00
<br /> 60221100 MANHOLES,TYPE A,S'DIAMETER,TYPE 1 FRAME,CLOSED LID 2 EACH 51,400.00 52,800.00 Sti,:29.20 52,858.40 51,800.00 53,200.00 57,TJ0.00 53,400.00
<br /> 60238710 INLETS,TYPE A,WITH SPECIAL GRATE 1 EACH 58�.00 5650.00 5964.44 E864.44 5800.00 5800.00 E700.00 5700.00
<br /> 60240380 INLETS,TYPE B,WITH SPECIAL GRATE 2 EACH 51,200.00 52,400.00 51.053.1G E2,106.28 S9`�.00 51,800.00 S9�•00 51.800.00
<br /> 70102620 TR CONT 8 PROT 701501 1 LS 52.000.00 52,000.00 53,000.00 53,000.00 52,000.00 52,000.00 E3,000.00 53,000.00
<br /> Z6022170 MANHOLES,TYPE A,5-0L4METER,WITH SPECIAL GRATE 5 EACH 51,750•00 58,750.00 51,485.86 57,428.30 51,700.00 5a,500.00 57,650.00 Sa,z`.�0•00
<br /> TOTAL BID As Corrected 5128.273.78 5109 835.78 5177,149.00 5127 545.00
<br /> •14.37X -8.67X -0.57X
<br /> Percent Over or Under ENGINEER'S ESTIMATE
<br /> ��---f 8 _ zo`�Z .
<br /> Matthew C.Newell,P.E.,City Engineer Date
<br />
|